Tender Details
Particulars | Details |
---|---|
Title |
Cement Concrete Work On Road With Maintain Level Of Main Road In Place Of Damaged Road In Kumawat Mohalla At Arandiya Village In Ward No. 36 Under Zone No. 22
|
Description |
Cement Concrete Work On Road With Maintain Level Of Main Road In Place Of Damaged Road In Kumawat Mohalla At Arandiya Village In Ward No. 36 Under Zone No. 22
|
Organisation | Directorate Urban Administration and Development | State Govt. and UT |
Tender Id | 2025_UAD_394722_1 |
Reference Number |
147/SE/BILLS/24-25/G-12 |
Tender Fee | 5581 |
EMD | 37000 |
Tender Value | |
Place | INDORE |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=464590 |
Start Date | January 14, 2025 14:30 |
End Date |
11/02/2025 ( Expired 98 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreRepairing work of drain/culvert and road at different places in ward no. 06
Repairing work of drain/culvert and road at different places in ward no. 06
Read moreConstruction of cc road at different place at pauranik tola in ward no. 04
Construction of cc road at different place at pauranik tola in ward no. 04
Read moreConstruction of boundary wall on backline in the middle of saf line and narayan bagh in ward no. 57 under zone no. 03
Construction of boundary wall on backline in the middle of saf line and narayan bagh in ward no. 57 under zone no. 03
Read moreLaying of strom water line from prem nagar basti to 60 feet road in ward no. 04 under zone no. 20
Laying of strom water line from prem nagar basti to 60 feet road in ward no. 04 under zone no. 20
Read moreof your Industry type