Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Improvement Of Bund Wall Below The Jvlr Junction Flyover South Bound
|
| Description |
Improvement Of Bund Wall Below The Jvlr Junction Flyover South Bound
|
| Organisation | Municipal Corporation of Greater Mumbai | State Govt. and UT |
| Tender Id | 2024_MCGM_1017723_1 |
|
Reference Number |
ACS/OD/5754 |
| Tender Fee | 0 |
| EMD | 16222 |
| Tender Value | - |
| Place | BMC S WARD OFFICE |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1780500 |
| Start Date | February 26, 2024 23:30 |
| End Date |
Expired
02/03/2024
Expired 957 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual plan-bharanikkavu gp 128/2026-27-ayyankali junction pongumkutty ambalam south junction road renovation w-8-general civil work
Annual plan-bharanikkavu gp 128/2026-27-ayyankali junction pongumkutty ambalam south junction road renovation w-8-general civil work
Read moreConstruction of the flyover at ch. 59.200 on ranakpur highway junction and at ch 93.835 on pacific junction on pindwara udaipur section of nh 27 in the state of rajasthan on epc mode
Construction of the flyover at ch. 59.200 on ranakpur highway junction and at ch 93.835 on pacific junction on pindwara udaipur section of nh 27 in the state of rajasthan on epc mode
Read moreConstruction of rcc retaining wall below the electricity transmission tower along gullana to power house road near junction point at bvpcl colony at chulla
Construction of rcc retaining wall below the electricity transmission tower along gullana to power house road near junction point at bvpcl colony at chulla
Read moreRepairs to safety grill at vijay nagar flyover and marol maternity home, marol, andheri (east) in beat no. 75 in k/south ward.
Repairs to safety grill at vijay nagar flyover and marol maternity home, marol, andheri (east) in beat no. 75 in k/south ward.
Read moreReplacement of existing pipe bridges below of size 0.90m dia in to rcc box bridges in the jurisdiction of sr. den/south of jodhpur division.
Replacement of existing pipe bridges below of size 0.90m dia in to rcc box bridges in the jurisdiction of sr. den/south of jodhpur division.
Read moreConstruction of the flyover at dedwa village at km 276.110 and kurja phanta junction at km 162.332 on barmer gandhav gujarat border section of nh 68 in the state of rajasthan on epc mode
Construction of the flyover at dedwa village at km 276.110 and kurja phanta junction at km 162.332 on barmer gandhav gujarat border section of nh 68 in the state of rajasthan on epc mode
Read moreRoutine maintenance work of flyover at y junction in rahatgaon in front of hotel gauri inn amravati from km.148.490 to km 150.070 on nh6 on risk and cost of epc contractor on item rate basis (2nd call)
Routine maintenance work of flyover at y junction in rahatgaon in front of hotel gauri inn amravati from km.148.490 to km 150.070 on nh6 on risk and cost of epc contractor on item rate basis (2nd call)
Read moreName of work: design, supply, erection, testing and commissioning of ohe electrification (25 kv ac, 50 hz) and psi works (sp/ssp) in connection with idh yard remodelling (phase-ii) and ohe electrification (2x25 kv ac,50 hz) of bhandai flyover for etawah-bound down trains , agra division, n.c. railway.
Name of work: design, supply, erection, testing and commissioning of ohe electrification (25 kv ac, 50 hz) and psi works (sp/ssp) in connection with idh yard remodelling (phase-ii) and ohe electrification (2x25 kv ac,50 hz) of bhandai flyover for etawah-bound down trains , agra division, n.c. railway.
Read moreConstruction of 6 lane flyover at tuljapur junction at km 2.950 on tuljapur-ausa section of nh361 with additional service road towards tuljapur city of length of 1.265 km (total length 2.455 km) for rectification of accident spot on epc mode
Construction of 6 lane flyover at tuljapur junction at km 2.950 on tuljapur-ausa section of nh361 with additional service road towards tuljapur city of length of 1.265 km (total length 2.455 km) for rectification of accident spot on epc mode
Read moreDeposit-alappuzha jillapanchayat- bharanicavugp- construction of a temporary ph, supply, erection, and commissioning of a pumpset for the new tube well based water supply scheme at the south of koyickal junction and opposite govthomeoclinic in ward19
Deposit-alappuzha jillapanchayat- bharanicavugp- construction of a temporary ph, supply, erection, and commissioning of a pumpset for the new tube well based water supply scheme at thesouth of koyickal junction andopposite govt homeoclinic in ward19
Read moreof your Industry type