Providing Man Power Supply For Debris Clearance Excavation And Reconstruction Of Temples Of State Protected Monuments And Archaeological Sites Of M.P.
Description
Providing Man Power Supply For Debris Clearance Excavation And Reconstruction Of Temples Of State Protected Monuments And Archaeological Sites Of M.P.
Organisation Government of Madhya Pradesh
Tender Id 2023_DAAM_292795_1
Reference
Number
1488
Tender Fee 10000
EMD 1 Lakh
Tender Value 0
Place Bhopal
Link
View Original Tender Notice

https://mptenders.gov.in

Start Date July 22, 2023 16:30
End Date
Expired 09/08/2023

Expired 1163 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Setting up and running souvenir shop at cluster g of centrally protected monuments, sites and museum

Setting up and running souvenir shop at cluster g of centrally protected monuments, sites and museum

Read more
Setting up and running souvenir shop at cluster b of centrally protected monuments/ sites and museums

Setting up and running souvenir shop at cluster b of centrally protected monuments/ sites and museums