Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
04 Nos. Drive Head Belt Structure 520 Mtr, 03 Nos. Haulage Track Line 450 Mtr, 4 Inch Dia Pipe Line 520 Mtr, Vcb 03 Nos., Acb 03 Nos., Power Cable 2000 Mtr, Loading, Transportation And Unloading Of Materials From Different Place Of Vindhya Ug Mine
|
| Description |
04 Nos. Drive Head Belt Structure 520 Mtr, 03 Nos. Haulage Track Line 450 Mtr, 4 Inch Dia Pipe Line 520 Mtr, Vcb 03 Nos., Acb 03 Nos., Power Cable 2000 Mtr, Loading, Transportation And Unloading Of Materials From Different Place Of Vindhya Ug Mine
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_SECL_292081_1 |
|
Reference Number |
SECL/GM/JOH/Survey/ eTender/23-24/ 22 dt26/10/2023 |
| Tender Fee | - |
| EMD | 8200 |
| Tender Value | - |
| Place | Area Survey Dept GM OfficeJohilla Area Nowrozabad |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | October 27, 2023 15:30 |
| End Date |
Expired
06/11/2023
Expired 1072 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair, replacement of ht poles, acsr conductors, ht oh lines and ug cables, transformers, god, vcb, acb and other allied e/m works at chh sambhajinagar mil station under ge (s) ahilyanagar
As per tender documents
Read moreRepair, replacement of ht poles, acsr conductors, ht oh lines, ht ug cables transformers, god, vcb, acb, lt ug cables, lt oh lines, mccb, earthing pit, lt panel boards, lt poles and misc e/m works at mil stn bhusawal under ge (s) anr
As per tender documents
Read moreInstallation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Installation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Read moreErecting 100 kva transformer at vakkath road laying 450 mtr ug cable and construction of 85 mtr lt line under ele sec vennala
Erecting 100 kva transformer at vakkath road laying 450 mtr ug cable and construction of 85 mtr lt line under ele sec vennala
Read moreRepair/preventive maint of transformers dg sets amf panel vcb/acb panel and other ht/lt switchgears and ug cable at patparganj and mayur
Repair/preventive maint of transformers dg sets amf panel vcb/acb panel and other ht/lt switchgears and ug cable at patparganj and mayur vihar qtrs new delhi under ge south west new delhi
Read moreWhite washing and stone dusting of belt roadway/ tr and haulage roadway of cm-16 panel and pumping station of mxdw sump of l-1b seam at vindhya ug mine, pinoura sub area, johilla area
White washing and stone dusting of belt roadway/ tr and haulage roadway of cm-16 panel and pumping station of mxdw sump of l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Read moreInstallation of 03 nos. endless haulage, 01 no. direct haulage and laying of haulage track to facilitate material transportation in 16lw panel of iv-b seam and new panel of seam-ii in ug at piparia colliery, umaria sub area, johilla area
Installation of 03 nos. endless haulage, 01 no. direct haulage and laying of haulage track to facilitate material transportation in 16lw panel of iv-b seam and new panel of seam-ii in ug at piparia colliery, umaria sub area, johilla area
Read moreCleaning / removal of debris/ stone from return gallery of ventilation and stacking within 50 mtr. distance in l-1b seam at vindhya ug mine, pinoura sub area of johilla area
Cleaning / removal of debris/ stone from return gallery of ventilation and stacking within 50 mtr. distance in l-1b seam at vindhya ug mine, pinoura sub area of johilla area
Read moreInstallation of 03 nos. main belt conveyor and 03 nos. nos pony belt conveyor for depillaring of cm-15 and cm-16 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Installation of 03 nos. main belt conveyor and 03 nos. nos pony belt conveyor for depillaring of cm-15 and cm-16 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Read moreRepair and maintenance of three (03) nos. vacuum circuit breaker (vcb) installed at fan house and cro substation under churi ug, nk area
Repair and maintenance of three (03) nos. vacuum circuit breaker (vcb) installed at fan house and cro substation under churi ug, nk area
Read moreof your Industry type