Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rcc Foundations Of Oil Type Double Shaft Grizzly For Mobile Crusher Unit At 2nd Vertical Shaft At Ukwa Mine.
|
| Description |
Rcc Foundations Of Oil Type Double Shaft Grizzly For Mobile Crusher Unit At 2nd Vertical Shaft At Ukwa Mine.
|
| Organisation | MOIL Limited | Central Govt. Ministry/Department |
| Tender Id | 2024_MOIL_748154_1 |
|
Reference Number |
AGT/CIVIL/UK/LT/23-24/1900 DT. 29.02.2024 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | UKWA MINE |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1051328 |
| Start Date | February 29, 2024 21:30 |
| End Date |
Expired
09/03/2024
Expired 912 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of ventilation fan room for 2nd vertical shaft of ukwa mine.
Construction of ventilation fan room for 2nd vertical shaft of ukwa mine.
Read moreLaying of 4 gi vertical pipeline for dewatering at 2nd vertical shaft of ukwa mine.
Laying of 4 gi vertical pipeline for dewatering at 2nd vertical shaft of ukwa mine.
Read moreNdt of csg components of 1st and 2nd vertical shaft at ukwa mine.
Ndt of csg components of 1st and 2nd vertical shaft at ukwa mine.
 
Read moreStructure stability test of 2nd vertical shaft head gear structure at ukwa mine.
Structure stability test of 2nd vertical shaft head gear structure at ukwa mine.
Read moreNdt of csg components of 1st and 2nd vertical shaft at ukwa mine.
Ndt of csg components of 1st and 2nd vertical shaft at ukwa mine.
Read moreDriling of muck generation hole at 1150 level 2nd vertical shaft at ukwa mine.
Driling of muck generation hole at 1150 level 2nd vertical shaft at ukwa mine.
Read moreTub pushing from all level in(underground) to surfaces at 2nd vertical shaft ukwa mine
Tub pushing from all level in(underground) to surfaces at 2nd vertical shaft ukwa mine
Read moreDrilling of muck generation hole at 950 level of 2nd vertical shaft at ukwa mine.
Drilling of muck generation hole at 950 level of 2nd vertical shaft at ukwa mine.
Read moreSchedule maintenance and general inspection of rigid guides rails of 1st vertical shaft and 2nd vertical shaft winder of ukwa mine
Schedule maintenance and general inspection of rigid guides rails of 1st vertical shaft and 2nd vertical shaft winder of ukwa mine
Read morePushing of lhd loaded tubs from 6th and 8th level of 2nd vertical shaft at ukwa mine
Pushing of lhd loaded tubs from 6th and 8th level of 2nd vertical shaft at ukwa mine
Read moreof your Industry type