Title
Construction Of Ramp And Stair At Head Of Baira East Pump Canal Including All Cost Of Material (Excluding Cement And Brick ), Labour, T And P Used Complete In All Respects As Per Drawing Provided By Department. As Directed By Engineer In Charge.
Description
Construction Of Ramp And Stair At Head Of Baira East Pump Canal Including All Cost Of Material (Excluding Cement And Brick ), Labour, T And P Used Complete In All Respects As Per Drawing Provided By Department. As Directed By Engineer In Charge.
Organisation U P Irrigation Department (Mechanical) | State Govt. and UT
Tender Id 2024_UPIDM_886995_3
Reference
Number
18/EE/MMLCD/VNS/2023-24
Tender Fee 766
EMD 15000
Tender Value
Place EXECUTIVE ENGINEER MINOR LIFT CANAL DIVISION VARAN
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1520578
Start Date January 30, 2024 17:30
End Date

06/02/2024 ( Expired 489 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material,

1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material

Read more
Investigation and survey on gis basis of the project area including soil investigation engineering design hydraulic and structural as required procurement of all labour and material t and p etc and construction of various components complete

Construction of 0.6 mld stp pumping station conveyance system and other associated sewerage &amp#x0d works and drain works in patelpuram gaytri shaktipeeth, gomti nagar vistar sector1 district &amp#x0d lucknow up india &amp#x0d

Read more
1st class brick for lining of canal with 100 percent new brick alongwith main canal bed from chainage (0.450 to 1.00) km with all cost of material, labour, tool and plant etc as required as per drawing and boq at phagoopur pump can

1st class brick for lining of canal with 100 percent new brick alongwith main canal bed from chainage (0.450 to 1.00) km with all cost of material, labour, tool and plant etc as required as per drawing and boq at phagoopur pump canal in raibareli

Read more
1st class brick lining work with 100 percent new brick from chanage (0.00 to 0.700) km along with cement plaster on both side and cc work on bed with glass strip from (0.00 to 0.700)km at adaura pump canal in district barabanki including all cost of

1st class brick lining work with 100 percent new brick from chanage (0.00 to 0.700) km along with cement plaster on both side and cc work on bed with glass strip from (0.00 to 0.700)km at adaura pump canal in district barabanki including all cost of

Read more
Investigation and survey on gis basis of the project area including soil investigation engineering design hydraulic and structural as required procurement of all labour and material t and p etc and construction of various components complete

Construction of 0.6 mld stp pumping station conveyance system and other associated sewerage works and drain works in patelpuram gaytri shaktipeeth, gomti nagar vistar sector1 district lucknow up india

Read more
First class brick lining work 1 3 cm in mawai minor from chainage 0.725 to 1.075 at kundakala pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as direc

First class brick lining work 1 3 cm in mawai minor from chainage 0.725 to 1.075 at kundakala pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as direc

Read more
Bank protection work of river bank right side of barge from 0.00 to 22.50 m at balua pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by e

Bank protection work of river bank right side of barge from 0.00 to 22.50 m at balua pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by e

Read more
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.

Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.

Read more
Strenthaning of uruwa minor by renovation of old brick lining 1 4 c.m. in between 0.000 km to 0.850 km at reruwa pump canal including all cost of material, (excluding cement and brick ) labour, t and p used, complete in all respect as per drawing p

Strenthaning of uruwa minor by renovation of old brick lining 1 4 c.m. in between 0.000 km to 0.850 km at reruwa pump canal including all cost of material, (excluding cement and brick ) labour, t and p used, complete in all respect as per drawing p