Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Fixing Of New Turbo Ventilators In Place Of Damaged Turbo Ventilators And Provision Of Translucent Sheets On Roof For Utilization Of Day Light In Shop Floors Inside Rfi.
|
Description |
Fixing Of New Turbo Ventilators In Place Of Damaged Turbo Ventilators And Provision Of Translucent Sheets On Roof For Utilization Of Day Light In Shop Floors Inside Rfi.
|
Organisation | ADVANCED WEAPONS AND EQUIPMENT INDIA LTD-AWEIL | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 1.01 Lakh |
Tender Value | |
Place | Rifle Factory Ishapore |
Link |
AAAAAAAAAA Login to view |
Start Date | June 28, 2025 23:30 |
End Date |
21/07/2025 ( 22 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Read moreE.l.d.c.no/smii/p5/1233/2024 selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 3 zones 6 and 9
Selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 3 zones 6 and 9&#x0d
Read moreE.l.d.c.no/smii/p5/1232/2024 selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 2 zones 7 8 and10
&#x0d &#x0d selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 2 zones 7 8 and10&#x0d
Read moreE.l.d.c.no/smii/p1/1231/2024 selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 1zones1 2 3 4 and 5
Selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 1zones1 2 3 4 and 5&#x0d
Read moreRepair of roof structure with roof sheets in pit side 02 shop and 03 mfs/ffp
Repair of roof structure with roof sheets in pit side 02 shop and 03 mfs/ffp
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreCement concrete work on road and maintenon road level with main road in place of damaged road from krishna dairy to a.g. 152 in ward no. 29 under zone no. 07
Cement concrete work on road and maintenon road level with main road in place of damaged road from krishna dairy to a.g. 152 in ward no. 29 under zone no. 07
Read moreConstruction of 4 new foot over bridges in indore on design, built, operate and transfer basis and maintenance of existing three fobs for license period of 10 years (extendable to five years)
Construction of 4 new foot over bridges in&#x0d indore on design, built, operate and transfer&#x0d basis and maintenance of existing three fobs&#x0d for license period of 10 years (extendable to&#x0d five years)
Read moreLaying a new drainage line from councillors fund in place of the damaged drainage line from pappu bhatia jis wooden stall to central bank and in the surrounding lanes under zone number 09 ward number 47.
Laying a new drainage line from councillors fund in place of the damaged drainage line from pappu bhatia jis wooden stall to central bank and in the surrounding lanes under zone number 09 ward number 47.
Read moreLaying new drainage line in place of damaged drainage line from councillor fund in nehru nagar road no. 03 and 04 under zone no. 09 ward no. 26 in ghanshyam verma, shiv gogde and kamala tent back line in road no. 04 and 05.
Laying new drainage line in place of damaged drainage line from councillor fund in nehru nagar road no. 03 and 04 under zone no. 09 ward no. 26 in ghanshyam verma, shiv gogde and kamala tent back line in road no. 04 and 05.
Read moreof your Industry type