Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Requirement Of Supply, Installation And Commissioning Of Oil, Gas Fired Boiler Shell Type Capacity 1000 Kg Per Hr. With All Accessories Including Construction Of Rcc Boiler House And Chimney Foundation Work
|
| Description |
Requirement Of Supply, Installation And Commissioning Of Oil, Gas Fired Boiler Shell Type Capacity 1000 Kg Per Hr. With All Accessories Including Construction Of Rcc Boiler House And Chimney Foundation Work
|
| Organisation | RCDF- MD | State Govt. and UT |
| Tender Id | 2025_RCDF_462767_1 |
|
Reference Number |
JHLDAIRY/2025-25/291-96 |
| Tender Fee | 2090 |
| EMD | 1.5 Lakh |
| Tender Value | - |
| Place | JHALAWAR |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=835056 |
| Start Date | May 06, 2025 14:30 |
| End Date |
Expired
07/05/2025
Expired 529 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Oil fired interconnected boiler of capacity 4000 kg/hr and 2000 kg/hr confirming to ibr norms.
Oil fired interconnected boiler of capacity 4000 kg/hr and 2000 kg/hr confirming to ibr norms.
Read moreSteam boilers of 10000 kg/hr and piping system,water softening plant,furnace oil day (fo) & storage tanks, steel chimney & fo storage & transfer system,electrical systems & instrumentation & control systems
Steam boilers of 10000 kg/hr and piping system,water softening plant,furnace oil day (fo) & storage tanks, steel chimney & fo storage & transfer system,electrical systems & instrumentation & control systems
Read moreReplacement of chlorinators of 40 kg/hr capacity and booster pump sets along with accessories and allied work at chlorinator room, chemical section, bhandup complex
Replacement of chlorinators of 40 kg/hr capacity and booster pump sets along with accessories and allied work at chlorinator room, chemical section, bhandup complex.
Read moreSelf cure acylic powder pink shade bott of 110 gm with rapid repair liquid 110ml,self cure acylic powder clear shade bott of 110 gm with rapid repair liquid,haemostatic sponge gelatin,rubber base impression material kit with accessories,patient bib, plastic,rolls, abs cotton dental assorted size box of 50,sheet for vacuum pressure moulding system set of 10 sheets,disposable rvg sensor sleeve pkt of 1000,syringe hypodermic cartridge type needle disposal pkt of 100 size 25 mm,crown and bridge die stone super hard pkt of 1 kg,lubricant spray bott of 500ml
Self cure acylic powder pink shade bott of 110 gm with rapid repair liquid 110ml,self cure acylic powder clear shade bott of 110 gm with rapid repair liquid,haemostatic sponge gelatin,rubber base impression material kit with accessories,patient bib, plastic,rolls, abs cotton dental assorted size box of 50,sheet for vacuum pressure moulding system set of 10 sheets,disposable rvg sensor sleeve pkt of 1000,syringe hypodermic cartridge type needle disposal pkt of 100 size 25 mm,crown and bridge die stone super hard pkt of 1 kg,lubricant spray bott of 500ml
Read moreChimney and ducting suitable for 1000 kg./hr. ibr boiler
Chimney and ducting suitable for 1000 kg./hr. ibr boiler
Read moreSupply, installation & commissioning of hsd fired steam boiler of capacity- 300 kg/hr
For complete deion and other details, please refer to tender
Read moreM/58/hbpcl/foundation of boiler and boiler chimney
M/58/hbpcl/foundation of boiler and boiler chimney
Read moreM/43 foundation of newly procured boiler and boiler chimney
M/43 foundation of newly procured boiler and boiler chimney
Read moreSupply and commissioning of chimney for 3 ton wood fired boiler
Design, supply, erection, testing and commissioning of chimney for 3 ton wood fired boiler
Read moreof your Industry type