| Particulars | Details |
|---|---|
| Title |
Redevelopment Of Kanniyakumari Railway Station On Engineering, Procurement And Construction (Epc) Mode
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 72412983 |
|
Reference Number |
32-CE-CN-ERS-2023-EPC |
| Tender Fee | 0 |
| EMD | 33.21 Lakh |
| Tender Value | - |
| Place | Chennai |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/012024/72412983/viewNitPdf_4416399.pdf |
| Start Date | December 05, 2023 23:16 |
| End Date |
Expired
25/01/2024
Expired 952 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of rob at ch-26th km of sobhan chowk (nh-27) to agropatti chowk makia (sh-52) road project (announced during pragati yatra) under district of darbhanga, bihar on epc mode
Construction of rob at ch-26th km of sobhan chowk (nh-27) to agropatti chowk makia (sh-52) road project (announced during pragati yatra) under district of darbhanga, bihar on epc mode
Read moreConstruction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Read moreConstruction of proposed centre of excellence of fire testing, training and research laboratory at iit patna, bihar (on epc basis)
Construction of proposed centre of excellence of fire testing, training and research laboratory at iit patna, bihar (on epc basis)
Read moreConstruction of elevated corridor from marenahalli main road (ragigudda junction) to kanakapura main road via bwssb pipeline road (thalaghattapura junction) in bengaluru city on boot (toll) mode dynamic duration
Construction of elevated corridor from marenahalli main road (ragigudda junction) to kanakapura main road via bwssb pipeline road (thalaghattapura junction) in bengaluru city on boot (toll) mode dynamic duration
Read moreMaintenance of road from hirapur (kalaburagi ring road) connecting neeloor cross (on sh155) via bablad(s), savalgi railway station, hunsihadgil, neeloor from ch. km 13.30 to 17.24 in kalaburagi taluka under 3054 mdr road maintenance for the year 2026-27
Maintenance of road from hirapur (kalaburagi ring road) connecting neeloor cross (on sh155) via bablad(s), savalgi railway station, hunsihadgil, neeloor from ch. km 13.30 to 17.24 in kalaburagi taluka under 3054 mdr road maintenance for the year 2026-27
Read moreEstablishing 2x12.5mva, 66/11kv sub-station at paduvalahippe village along with construction of 66kv lilo line on 110kv dc towers using coyote conductor for a distance of 1.520km
Establishing 2x12.5mva, 66/11kv sub-station at paduvalahippe village along with construction of 66kv lilo line on 110kv dc towers using coyote conductor for a distance of 1.520km from the existing 66kv kadavinakote-hanagarahally-hassan line-1 to proposed padavalahippe substation in holenarasipura taluk, hassan district on partial turnkey basis including supply of all materials/equipments (excluding supply of 2x12.5mva 66/11kv power transformers and 11kv switchgear) and erection (including civil works) of all materials/equipments, testing and commissioning.
Read moreConstruction of elevated corridor from yeshwanthapura (methikere cross) to old madras road (tin factory junction kr puram) via iisc - mekri circle - jayamahal - st. john church road - ulsoor lake (3 lane x 2 flyover) in bengaluru city on boot (toll) mode - dynamic duration
Construction of elevated corridor from yeshwanthapura (methikere cross) to old madras road (tin factory junction kr puram) via iisc - mekri circle - jayamahal - st. john church road - ulsoor lake (3 lane x 2 flyover) in bengaluru city on boot (toll) mode - dynamic duration
Read moreEst 2x20 mva, 66/11kv ss at kodihalli and construction of 66kv dc ine on dc towers from ongoing 220/66/11kv bharamasagara ss for a distance of 9.305kms using panther conductor along with construction of 02 nos. of 66kv tbs at ongoing 220/66/11kv bharamasagara (ajjappanahally) sub station in chitradurga taluk and district including supply of all matching materials/equipments (excluding supply 11kv switchgear) and erection (including dismantling and civil works) of all materials/ equipment, tandc
Establishing 2x20 mva, 66/11kv sub-station at kodihalli and construction of 66kv dc ine on dc towers from ongoing 220/66/11kv bharamasagara (ajjapanahally) sub-station for a distance of 9.305kms using panther conductor along with construction of 02 nos. of 66kv terminal bays at ongoing 220/66/11kv bharamasagara (ajjappanahally) sub station in chitradurga taluk and district including supply of all matching materials/equipments (excluding supply 11kv switchgear) and erection (including dismantling and civil works) of all materials/ equipment, testing and commissioning.
Read moreRedevelopment of chengannur railway station on epc mode
For complete deion and other details, please refer to tender
Read moreRedevelopment of bina railway station of west central railway, bhopal division on engineering, procurement and construction (epc) mode.
For complete deion and other details, please refer to tender
Read moreof your Industry type