Tender Details
Particulars | Details |
---|---|
Title |
Periodical Repair Of Various Road Under Teliamura Sub Division I (I) Aa Road To Hrankhal Bazar (L 2.50 Km) Ch. 1.5 Km To 2.0 Km (Ii) Tk Road To Ayurvedic Hospital (L 0.90km) (Iii) Ward Office No. 6 To Khowai River Under Tmc/ Sh Patch Metalling, Re C
|
Description |
Periodical Repair Of Various Road Under Teliamura Sub Division I (I) Aa Road To Hrankhal Bazar (L 2.50 Km) Ch. 1.5 Km To 2.0 Km (Ii) Tk Road To Ayurvedic Hospital (L 0.90km) (Iii) Ward Office No. 6 To Khowai River Under Tmc/ Sh Patch Metalling, Re C
|
Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
Tender Id | 2024_CEPWD_51079_1 |
Reference Number |
21/EE/TLM/PWD(RandB)/2024-25 |
Tender Fee | 1000 |
EMD | 48324 |
Tender Value | |
Place | Teliamura |
Link | https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=52592 |
Start Date | August 27, 2024 21:30 |
End Date |
12/09/2024 ( Expired 272 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Read moreMtc. of road from ice cream factory (near matabari school) to bramhachara road ch.0.00 km to ch.0.65 km under matabari block, gomati, tripura/s.h patch repairing, patch carpetting and allied works during the year 2025-26. (group-i)
Mtc. of road from ice cream factory (near matabari school) to bramhachara road ch.0.00 km to ch.0.65 km under matabari block, gomati, tripura/s.h patch repairing, patch carpetting and allied works during the year 2025-26. (group-i)
Read moreMtc of road from kambaltilla bazar to bagan para (l 3.00 km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh patch wbm-3, patch recarpeting, seal coat etc portion from ch 0.00km to ch 1.50 km.
Mtc of road from kambaltilla bazar to bagan para (l 3.00 km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh patch wbm-3, patch recarpeting, seal coat etc portion from ch 0.00km to ch 1.50 km.
Read moreMtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 8.00km to ch 12.00 km.
Mtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 8.00km to ch 12.00 km.
Read moreMtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 4.00km to ch 8.00 km.
Mtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 4.00km to ch 8.00 km.
Read moreMtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 0.00km to ch 4.00 km.
Mtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 0.00km to ch 4.00 km.
Read moreUrgent mtc of road from kambaltilla bazar to bagan para (l- 3.00 km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh patch wbm-3, carpeting, seal coat etc portion from ch 1.50km to ch 3.00km.
Urgent mtc of road from kambaltilla bazar to bagan para (l- 3.00 km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh patch wbm-3, carpeting, seal coat etc portion from ch 1.50km to ch 3.00km.
Read moreFdr maintenance of road from mandwi to chachu bazar (l 9.533 km) under mandwi sub division during the year 2025-2026. (group-i).
Fdr maintenance of road from mandwi to chachu bazar (l 9.533 km) under mandwi sub division during the year 2025-2026. (group-i).
Read morePr of road from pecharthal laljuri road to shantinagar awc l 0 900 km during the year 2025 26 sh surface drain patch metalling carpeting seal coat and protection works from ch 0 00km to ch 0 90 km
Pr of road from pecharthal laljuri road to shantinagar awc l 0 900 km during the year 2025 26 sh surface drain patch metalling carpeting seal coat and protection works from ch 0 00km to ch 0 90 km
Read morePeriodical repair of the road from nh 08 to steel hanging bridge over deo river under deo valley vc l 700 00m during the year 2025 26 sh patch soling patch metalling grouting carpeting etc
Periodical repair of the road from nh 08 to steel hanging bridge over deo river under deo valley vc l 700 00m during the year 2025 26 sh patch soling patch metalling grouting carpeting etc
Read moreof your Industry type