Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Reconstruction Work Of Damages Due To Laying Of Jio Fiber Cable From Km. 18 To 21 And Patch Maintenance Work By Bm/Sdbc From Km. 17 To 30 Of Bkcm M.R.
|
Description |
Reconstruction Work Of Damages Due To Laying Of Jio Fiber Cable From Km. 18 To 21 And Patch Maintenance Work By Bm/Sdbc From Km. 17 To 30 Of Banswara Kansil Chandranagar Mohankhal (Sh 56) Motor Road In Augastyamuni Block Distt Rudraprayag.
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_pwd_69496_1 |
Reference Number |
245/3AC, Dated 13-02-2024_4 |
Tender Fee | 2360 |
EMD | 56000 |
Tender Value | |
Place | Ukhimath |
Link | https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=83535 |
Start Date | February 16, 2024 20:30 |
End Date |
26/02/2024 ( Expired 487 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreMaintenance work on up/haryana border -yamunanagar- saha-panchkula section of (old nh-73) (new nh-344) from km. 71.400 to km. 176.400 (package-1,2, 3) in the state of haryana and allied works on zirakpur-parwanoo section of nh-05.
Maintenance work on up/haryana border -yamunanagar- saha-panchkula section of (old nh-73) (new nh-344) from km. 71.400 to km. 176.400 (package-1,2, 3) in the state of haryana and allied works on zirakpur-parwanoo section of nh-05.
Read moreMaintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh
Maintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh
Read moreEmergent repairing work of bblr (sh-11a) from 58.770 km to 58.99 km by providing gsb-iii, wmm layer, bm, p.c. s.c. and side shoulders by jhama moorum consolidation etc. under jangipur sub-division under berhampore division no.-i, p.w.d during 25-26
Emergent repairing work of bblr (sh-11a) from 58.770 km to 58.99 km by providing gsb-iii, wmm layer, bm, p.c. s.c. and side shoulders by jhama moorum consolidation etc. under jangipur sub-division under berhampore division no.-i, p.w.d during 2025-
Read moreReconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.
Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.
Read moreMacadamization of road from manohar galla to kassi swari by way of providing and laying wbm grade 2nd 75mm thick in one layer, wbm grade 3rd, 20mm thick premix carpet over 50mm thick bm in km 1st rd 0 to km 2nd rd 200 length 1.2 km
Macadamization of road from manohar galla to kassi swari by way of providing and laying wbm grade 2nd 75mm thick in one layer, wbm grade 3rd, 20mm thick premix carpet over 50mm thick bm in km 1st rd 0 to km 2nd rd 200 length 1.2 km
Read moreAnnual repair and restoration (maintenance) works of existing akajan likabali bame (pkg-i) from km 12.000 to km 33.000 (total length 21 km) at risk and cost in state of arunachal pradesh
Annual repair and restoration (maintenance) works of existing akajan likabali bame (pkg-i) from km 12.000 to km 33.000 (total length 21 km) at risk and cost in state of arunachal pradesh
Read moreConstruction of road from pmgsy culvert to mohalla badhana ward no. 02, pyt. malhan tehsil surankote district poonch by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick wbm grade-iii 50
Construction of road from pmgsy culvert to mohalla badhana ward no. 02, pyt. malhan tehsil surankote district poonch by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick wbm grade-iii 50
Read moreConstruction of road from main road mandi phagla buffliaz km 7th to peer fazal shah ziyarat via mohalla kumarah surankote part 1st by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick w
Construction of road from main road mandi phagla buffliaz km 7th to peer fazal shah ziyarat via mohalla kumarah surankote part 1st by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick w
Read moreImprovement of link road from main road to mulwarwan margi by way of g.s.b,wbm gr ii gr iii, 50m mm bm and 25mm ogpc l1.50 km
Improvement of link road from main road to mulwarwan margi by way of g.s.b,wbm gr ii gr iii, 50m mm bm and 25mm ogpc l1.50 km
Read moreof your Industry type