Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Renewal Work By Pc Year 2024 25 In Bageshwar Kapkot Tejam Motor Road Km 18 To Baida Pakhad Dofar Motor Road Km 11 To 15 (Total Length 5.00) In District Bageshwar (In Anticipation).
|
Description |
Renewal Work By Pc Year 2024 25 In Bageshwar Kapkot Tejam Motor Road Km 18 To Baida Pakhad Dofar Motor Road Km 11 To 15 (Total Length 5.00) In District Bageshwar (In Anticipation).
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_pwd_70716_1 |
Reference Number |
949/Nivida date 29-02-2024 |
Tender Fee | 4720 |
EMD | 2.25 Lakh |
Tender Value | |
Place | Kapkot(Bageshwar) |
Link | https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=84911 |
Start Date | March 01, 2024 22:00 |
End Date |
07/03/2024 ( Expired 471 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Strengthening work by dbm bc in marchula sarikhet bajro pokhda stpuli pauri motor road sh 32 in km 41 to 75.500 in almora district under central road and infrastructure fund crif
Strengthening work by dbm bc in marchula sarikhet bajro pokhda stpuli pauri motor road sh 32 in km 41 to 75.500 in almora district under central road and infrastructure fund crif
Read moreDalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Read moreRenewal work kalyanpur aeriya kisanganj bhagwanpur to tehseel mahsi road in district bahraich financial year 2024-25 (vidhan sabha-mahsi)
Renewal work kalyanpur aeriya kisanganj bhagwanpur to tehseel mahsi road in district bahraich financial year 2024-25 (vidhan sabha-mahsi)
Read moreAAAAAAAAAA
Login to viewKirnahar ramghati road (odr) emergent repairing works and other allied works from 3.00 kmp to 5.00 kmp in patches of kirnahar highway sub-division under birbhum highway division-ii in the district of birbhum during the year 2025-26.
Read moreConstruction of h.l bridge over local nallah at 1.200 km on bhaler to kurul ps road in the district of bolangir under sby for the year 2024-25
Construction of h.l bridge over local nallah at 1.200 km on bhaler to kurul ps road in the district of bolangir under sby for the year 2024-25
Read moreReconstruction work of damaged wall and culvert at km. 1.00 to 4.00, km. 5.00 to 8.00, km. 9.00 to 12.00 and km. 13.00 to 16.00 of bageshwar-kapkot motor road to beda-majedha motor road. block-kapkot, distt. bageshawar. under natural disaster.
Reconstruction work of damaged wall and culvert at km. 1.00 to 4.00, km. 5.00 to 8.00, km. 9.00 to 12.00 and km. 13.00 to 16.00 of bageshwar-kapkot motor road to beda-majedha motor road. block-kapkot, distt. bageshawar. under natural disaster.
Read moreAAAAAAAAAA
Login to viewPatch repairing work from chainage 2.00 kmp to 5.00 kmp and 12.00 km to 15.00 km in stretches of nalhati rajgram road under rampurhat highway sub-division of birbhum highway division-i in the district of birbhum during the year 2025-26
Read moreStrengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road (odr), length 6.63 km under 5054 rb-10 roads (fy 2025-26) in district rupnagar including 5 years maintenace (1 year dlp and 4 years
Strengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road (odr), length 6.63 km under 5054 rb-10 roads (fy 2025-26) in district rupnagar including 5 years maintenace (1 year dlp and 4 years
Read moreRenewal work by sdbc in km 8,9,10 (length 2.68 km) of ranichaeri nakot motor road in development block chamba under annual maintenance year 2025-26
Renewal work by sdbc in km 8,9,10 (length 2.68 km) of ranichaeri nakot motor road in development block chamba under annual maintenance year 2025-26
Read moreNabard-ridf-2025-26 - pudukkottai district - avudaiyarkoil panchayat union - package no. 18 - strengthening and five year maintenance to the kannamalkoil -veeramangalam road in perunavalur panchayat km 0/0 - 3/600 (r 444)
Nabard-ridf-2025-26 - pudukkottai district - avudaiyarkoil panchayat union - package no. 18 - strengthening and five year maintenance to the kannamalkoil -veeramangalam road in perunavalur panchayat km 0/0 - 3/600 (r 444)
Read moreof your Industry type