Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Quotation Sye1/8645/24 Renovation Of Various Drain And Roads In Divison 21
|
| Description |
Quotation Sye1/8645/24 Renovation Of Various Drain And Roads In Divison 21
|
| Organisation | Local Self Government Department | State Govt. and UT |
| Tender Id | 2025_LSGD_764062_1 |
|
Reference Number |
QUOTATION SYE1/8645/24 RENOVATION OF VARIOUS DRAIN AND ROADS IN DIVISON 21 |
| Tender Fee | 2760 |
| EMD | 38120 |
| Tender Value | |
| Place | KOCHI MUNICIPAL CORPORATION |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1244505 |
| Start Date | May 12, 2025 22:00 |
| End Date |
Expired
17/05/2025
Expired 430 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Read moreUnder district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreExpression of interest to invite prospective and probable manufactures/suppliers various materials required for manufacturing of different types of parachutes
Expression of interest to invite prospective and probable manufactures/suppliers various materials required for manufacturing of different types of parachutes
Read moreAnnual maintenance contract of ofc network in durgapur intracity and last mile connectivity in durgapur and other districts of south bengal (excluding kolkata and surrounding) under ertcc
Annual maintenance contract of ofc network in durgapur intracity and last mile connectivity in durgapur and other districts of south bengal (excluding kolkata and surrounding) under ertcc
Read moreStrengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreLicensing of co-branding and inside advertising rights of nine no. metro stations of corridor-1 (taj east gate - rbs college) of agra metro rail project in upmrc network.
Licensing of co-branding and inside advertising rights of nine no. metro 
 stations of corridor-1 (taj east gate - rbs college) of agra metro rail project in 
 upmrc network.
Read moreProvision of 50 bedded crisis ward and additional alteration upgradation of building no p-7/6 operation theatre at mh in military station pithoragarh
Provision of 50 bedded crisis ward and additional alteration upgradation of building no p-7/6 operation theatre at mh in military station pithoragarh
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreof your Industry type