Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Zone 02, Ward 08, Construction Of Rcc Drain And Culvert From Shiv Marriage Garden To Ghanshyam Singh Ji House.
|
Description |
Zone 02, Ward 08, Construction Of Rcc Drain And Culvert From Shiv Marriage Garden To Ghanshyam Singh Ji House.
|
Organisation | Directorate Urban Administration and Development | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2295 |
EMD | 12195 |
Tender Value | |
Place | OFFICE OF THE MUNICIPAL CORPORATION REWA (M.P.) |
Link |
AAAAAAAAAA Login to view |
Start Date | July 05, 2025 14:30 |
End Date |
04/08/2025 ( 25 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreConsultancy services for authority engineer for supervision of construction of 2l ps aambikapur bypass and sitapur bypass and pathalgaon bypass on ambikapur pathalgaon katni gumla road nh43 and ambikapur bypass from sanjaynagar to rajpuri khurd
Consultancy services for authority engineer for supervision of construction of 2l ps aambikapur bypass and sitapur bypass and pathalgaon bypass on ambikapur pathalgaon katni gumla road nh43 and ambikapur bypass from sanjaynagar to rajpuri khurd
Read moreRcc nala construction work at kamdhenu shopping centre , footpath and other repaire work in various parks and other development work at ward 35 civil line zone
Rcc nala construction work at kamdhenu shopping centre , footpath and other repaire work in various parks and other development work at ward 35 civil line zone
Read moreUpgradation of construction of six lane highway corridor from ch. 8/500 to 33/500 and upgradation of existing highway to six lanes from ch. 8/500 to 40/00 section at grade section of hadapsar yevat (nh-65) in the state of maharashtra
Upgradation of construction of six lane highway corridor &#x0d from ch. 8/500 to 33/500 and upgradation of existing &#x0d highway to six lanes from ch. 8/500 to 40/00 section at&#x0d grade section of hadapsar yevat (nh-65) in the state of &#x0d maharashtra
Read moreConstruction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii blocks of purba medinipur- wbdwsip/dww/em/03/2025-26
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii block of purba medinipur district with 2 yrs. o and m wbdwsip/dww/em/03/2025-26
Read moreConsultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Read moreConstruction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Read moreConsultancy services for preparation of dpr for 4 l of rudrampur to bhadrachalam section from km 71.0 to 171.6 of vijayawada to jagadalpur section of nh 30 and construction of kothagudem bypass connecting nh 930p and nh 30 in the state of telangana
Consultancy services for preparation of dpr for 4 l of rudrampur to bhadrachalam section from km 71.0 to 171.6 of vijayawada to jagadalpur section of nh 30 and construction of kothagudem bypass connecting nh 930p and nh 30 in the state of telangana
Read moreConsultancy services for authority engineer for supervision of construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu through an engineering, procu
Consultancy services for authority engineer for supervision of construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu through an engineering, procu
Read moreP/l rcc np3 main gravity sewer line, const of mps of 67.50 mld, 900 mm i/d pumping main from proposed mps to 30 mld stp, stp of capacity 30 mld including 5 years o and m of mps and stp, p/l treated water pipeline form cct to disposal point at moga
P/l rcc np3 main gravity sewer line, const of mps of 67.50 mld, 900 mm i/d pumping main from proposed mps to 30 mld stp, stp of capacity 30 mld including 5 years o and m of mps and stp, p/l treated water pipeline form cct to disposal point at moga
Read moreof your Industry type