Tender Details

Particulars Details
Title
Balancing Of Rotor And Inspection Of Bearing Of Stg #1 With Alignment At Gtps
Description
Balancing Of Rotor And Inspection Of Bearing Of Stg #1 With Alignment At Gtps (Please Refer Tender Documents)
Organisation IPGCL-PPCL | State Govt. and UT
Tender Id 2025_IPGCL_275406_1
Reference
Number
1000013683/CS/GTPS
Tender Fee 0
EMD 20700
Tender Value -
Place GTPS DELHI
Link
View Original Tender Notice

https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=362847

Start Date July 12, 2025 00:25
End Date
Expired 04/08/2025

Expired 435 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Testing service for on-board /commissioned equipment/ instrument related to plant - mechanical inspection of high axial shift of stg rotor inspection of high axial shift of stg rotor at tgbps

Testing service for on-board /commissioned equipment/ instrument related to plant - mechanical inspection of high axial shift of stg rotor inspection of high axial shift of stg rotor at tgbps

Read more
Procurement of balancing weight and other spares for main turbine at stg-ii, sgtpp.

Procurement of balancing weight and other spares for main turbine at stg-ii, sgtpp.

Read more
Horizontal hard bearing type two plane dynamic balancing machine as per attached annexure

Horizontal hard bearing type two plane dynamic balancing machine as per attached annexure

Read more
Air ratchet with standard accessories,belt tensioner guage,connecting rod alignment fixture,differtent type engine bearing model,injector

Air ratchet with standard accessories,belt tensioner guage,connecting rod alignment fixture,differtent type engine bearing model,injector

Read more
Design, engineering, manufacture, testing, inspection, packing, supply and delivery of one complete set of 150/175mw, 13.8kv generator/motor (stator and rotor) unit assembly consisting of stator including stator frame, stator core, stator bars etc., and rotor including spider, rotor rim, rotor poles and locking keys with suitable connecting accessories and other unit auxiliaries like stator air coolers with associated pipelines etc. exactly to fit in the existing pit and sole plates, and dismant

Design, engineering, manufacture, testing, inspection, packing, supply and delivery of one complete set of 150/175mw, 13.8kv generator/motor (stator and rotor) unit assembly consisting of stator including stator frame, stator core, stator bars etc., and rotor including spider, rotor rim, rotor poles and locking keys with suitable connecting accessories and other unit auxiliaries like stator air coolers with associated pipelines etc. exactly to fit in the existing pit and sole plates, and dismantling of existing unit, erection, testing and commissioning of new generator/motor unit at srisailam left bank hydro electric station (slbhes, reversible pumped storage plant), srisailam dam west, nagarkurnool dist., telangana, india.

Read more
Custom bid for services - transportation of hot axled wheel from kanpur to kota workshop for bearing inspection and repair for three years

Custom bid for services - transportation of hot axled wheel from kanpur to kota workshop for bearing inspection and repair for three years

Read more
1- impeller ci fg 260,2- shaft with key c40,3- shaft sleeve nut c40,4- casing wearing ring ci fg 260,5- gland ci fg 260,6- shaft sleeve ci fg 260,8- bearing outer cover de ci fg 260,7- bearing outer cover de ci fg 260,8- complete rotor assembly including bearing housing assly

1- impeller ci fg 260,2- shaft with key c40,3- shaft sleeve nut c40,4- casing wearing ring ci fg 260,5- gland ci fg 260,6- shaft sleeve ci fg 260,8- bearing outer cover de ci fg 260,7- bearing outer cover de ci fg 260,8- complete rotor assembly including bearing housing assly

Read more
300033375 ur5 p614 stage sleeve dist bush pn 521,300033376 p614 spacer suction pn 525 01 c i,300033379 ur5 p614 bearing cover motor side pn360,300033380 ur5 p614 bearing cover pump side pn 361,300033390 ur 5 p614 balancing disc pn 601,300033391 ur 5 p614 counter balancing disc pn 60,300033394 ur5 p614 bearing housing pn 350 c i,300033377 ur5 p614 indicator with bush pn 624,300033403 ur5 p614 shaft with key pn 210 aisi410,300033404 ur5 p614 shaft prot sleeve i pn 524 1,300033405 ur5 p614 shaft prot sleeve o pn 524 2,300002109 ur5 p614 set of gaskets o rings

300033375 ur5 p614 stage sleeve dist bush pn 521,300033376 p614 spacer suction pn 525 01 c i,300033379 ur5 p614 bearing cover motor side pn360,300033380 ur5 p614 bearing cover pump side pn 361,300033390 ur 5 p614 balancing disc pn 601,300033391 ur 5 p614 counter balancing disc pn 60,300033394 ur5 p614 bearing housing pn 350 c i,300033377 ur5 p614 indicator with bush pn 624,300033403 ur5 p614 shaft with key pn 210 aisi410,300033404 ur5 p614 shaft prot sleeve i pn 524 1,300033405 ur5 p614 shaft prot sleeve o pn 524 2,300002109 ur5 p614 set of gaskets o rings

Read more
Rear hub bearing,flexible hose assy,lock plate for grooved nut,sa of hose stg box,combination switch,base brush gear,clutch cyl assy,oil seal,assy vaccum hose for egr,assy coolent pipe,assy rear suspension bush,brake shoe set,hand brake cable

Rear hub bearing,flexible hose assy,lock plate for grooved nut,sa of hose stg box,combination switch,base brush gear,clutch cyl assy,oil seal,assy vaccum hose for egr,assy coolent pipe,assy rear suspension bush,brake shoe set,hand brake cable

Read more
Vt pump bowl assembly,suspension assembly with line shaft, bearings,,4-pole, ie3 vertical motor complete,discharge head, sole-base plate, coupling,complete automatic star-delta control,power-control cables, glands, lugs,special erection tools, mandatory spares,third-party inspection and factory performance,packing, freight, transit insurance, unloading,erection, installation, alignment, testing, 8-hour trial

Vt pump bowl assembly,suspension assembly with line shaft, bearings,,4-pole, ie3 vertical motor complete,discharge head, sole-base plate, coupling,complete automatic star-delta control,power-control cables, glands, lugs,special erection tools, mandatory spares,third-party inspection and factory performance,packing, freight, transit insurance, unloading,erection, installation, alignment, testing, 8-hour trial

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise