Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Cc Drain With Cover Slab From Anil Barman House Towards Pradip Barman House
|
| Description |
Construction Of Cc Drain With Cover Slab From Anil Barman House Towards Pradip Barman House
|
| Organisation | Zilla Parishad | State Govt. and UT |
| Tender Id | 2025_ZPHD_808554_2 |
|
Reference Number |
05/DKL/2024-25, Dated-30/01/2025 |
| Tender Fee | 500 |
| EMD | 6800 |
| Tender Value | |
| Place | P Rampur |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1797283 |
| Start Date | January 30, 2025 15:25 |
| End Date |
Expired
07/02/2025
Expired 530 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreDetailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode
Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction of rcc drain with cover slab and soak pit from kartik barman house towards gobinda barman house at kalibari sansad
Construction of rcc drain with cover slab and soak pit from kartik barman house towards gobinda barman house at kalibari sansad
Read moreConstruction of cc drain with cover slab from biren roy house towards parimal roy house
Construction of cc drain with cover slab from biren roy house towards parimal roy house
Read moreof your Industry type