Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🌞 Solar Power Procurement Opportunity At Indian Oil 🌞 Indian Oil, Under The Aegis Of The Central Government's Ministry/Department, Invites Bids For The Design, Supply, Installation, Testing, And Commissioning Of A Comprehensive 755 K Wp Grid Interactive Rooftop And Ground Mounted Solar Photovoltaic System Without Battery Backup. This Project Will Be Executed At Various Locations Under The Purview Of Wrpl, Rajkot Hq. 📅 Bid Submission Deadline: May 23, 2024, 4:00 Pm A Tender Fee Of Inr 0 Is Applicable, With An Earnest Money Deposit (Emd) Of Inr 39,47,000. Interested Bidders Must Possess The Requisite Expertise And Experience In Delivering Large Scale Solar Photovoltaic Projects. Proposals Should Encompass Detailed Technical Specifications, Cost Breakdowns, And A Timeline For Project Completion. Keywords: Solar Photovoltaic System, Grid Interactive, Indian Oil, Central Government, Wrpl, Rajkot, Renewable Energy Procurement, Solar Power Project, Tender, Emd| Particulars | Details |
|---|---|
| Title |
Pwrjt24001 Design Supply Installation Testing And Commissioning Of 755 K Wp Grid Interactive Rooftop And Ground Mounted Solar Photovoltaic System Without Battery Backup At Different Locations Of Wrpl
|
| Description |
Design Supply Installation Testing And Commissioning Of 755 K Wp Grid Interactive Rooftop And Ground Mounted Solar Photovoltaic System Without Battery Backup At Different Locations Of Wrpl
|
| Organisation | IndianOil | Central Govt. Ministry/Department |
| Tender Id | 2024_WRRAJ_176710_1 |
|
Reference Number |
PWRJT24001 |
| Tender Fee | 0 |
| EMD | 3.95 Lakh |
| Tender Value | - |
| Place | WRPL Rajkot HQ |
| Link |
View Original Tender Notice
https://iocletenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=187217 |
| Start Date | May 09, 2024 21:30 |
| End Date |
Expired
23/05/2024
Expired 877 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Proposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 2.0 mld stp (ganoda road)
Proposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 2.0 mld stp (ganoda road)
Read moreProposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 1.5 mld stp, near gopala goushala, sujangarh
Proposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 1.5 mld stp, near gopala goushala, sujangarh
Read moreProposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 1.5 mld stp, pipe line for supply treated water at stp 1.5 mld, near gopala goushala, sujangarh unit-ii
Proposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 1.5 mld stp, pipe line for supply treated water at stp 1.5 mld, near gopala goushala, sujangarh unit-ii
Read morePwrjt23010/design, supply, installation, testing and commissioning of 390 kwp grid interactive solar photovoltaic system (without battery backup) at different locations of wrpl
Pwrjt23010/design, supply, installation, testing and commissioning of 390 kwp grid interactive solar photovoltaic system (without battery backup) at different locations of wrpl
Read morePwrjt24013/ desitc of grid interactive solar photovoltaic system (without battery backup) and sitc of grid interactive inverter at rcp locations under wrpl.
Pwrjt24013/ desitc of grid interactive solar photovoltaic system (without battery backup) and sitc of grid interactive inverter at rcp locations under wrpl.
Read moreDesign, supply, installation, testing and commissioning of 390 kwp grid interactive solar photovoltaic system at different locations of wrpl
Design, supply, installation, testing and commissioning of 390 kwp grid interactive solar photovoltaic system at different locations of wrpl
Read morePwrjt24054 (group 1) desitc of grid interactive solar photovoltaic system (without battery backup) and sitc of grid interactive inverter at various rcp locations under wrpl in group 1
Pwrjt24054 (group 1) desitc of grid interactive solar photovoltaic system (without battery backup) and sitc of grid interactive inverter at various rcp locations under wrpl in group 1
Read moreSetting up grid connected rooftop solar photovoltaic system of capacity 25 kwp at kulpipanchyatsamityoffice
On grid solar system
Read moreSetting up of grid connected rooftop solar photovoltaic system of capacity 15 kwp at block development office,
Setting up of grid connected rooftop solar photovoltaic system of capacity 15 kwp at block development office,
Read moreProvision of 300 kwp solar rooftop photovoltaic plant at hubli workshop(including 60 months of comprehensive annual maintenance contract).
For complete deion and other details, please refer to tender
Read moreof your Industry type