Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Onsite Overhauling Cum Prive Maintenance Of Two Nos. Of Transformers, First 3.3 K V By 440 V, 750 K Va Transformer, Name Plate Missing And Second 3.3 K V By 440 V, 100 K Va, Pradip Lamp Make Transformer Installed At The Coal Stock, And The Excavatio
|
| Description |
Onsite Overhauling Cum Prive Maintenance Of Two Nos. Of Transformers, First 3.3 K V By 440 V, 750 K Va Transformer, Name Plate Missing And Second 3.3 K V By 440 V, 100 K Va, Pradip Lamp Make Transformer Installed At The Coal Stock, And The Excavatio
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_323505_1 |
|
Reference Number |
P.E. (EnM)/ Karo OCP/ e-tender/ 2024-25/ 80 |
| Tender Fee | 0 |
| EMD | 2600 |
| Tender Value | - |
| Place | KARO OCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=335344 |
| Start Date | December 18, 2024 16:30 |
| End Date |
Expired
27/12/2024
Expired 613 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacing faulty 11 kv ht metering cubicle with new one with and providing, erection & commissioning of 150/200 kva copper wound transformer at lmp site for the year 2026-27
Replacing faulty 11 kv ht metering cubicle with new one with and providing, erection & commissioning of 150/200 kva copper wound transformer at lmp site for the year 2026-27
Read moreInstallation of 50 kva, 3.3 kv/440 v, transformer at dudhmatia village under kathara colliery.
Installation of 50 kva, 3.3 kv/440 v, transformer at dudhmatia village under kathara colliery.
Read moreAugmentation of existing 200 kva 3.3 kv/440 v distribution transformer with 400 kva 3.3 kv/440v distribution transformer at 33 kv sub station, ph nb-3 in m.garh w.s. mech. division, narnaul
Augmentation of existing 200 kva 3.3 kv/440 v distribution transformer with 400 kva 3.3 kv/440v distribution transformer at 33 kv sub station, ph nb-3 in m.garh w.s. mech. division, narnaul
Read moreOn site prive maintenance of one no. 3.3 kv by 440 v, 630 kva (name plate missing) transformer, installed at kargali railway siding, and onsite prive maintenance of six nos. of transformers of capacity 40 kva to 100 kva, under karo ocp, bnk
On site prive maintenance of one no. 3.3 kv by 440 v, 630 kva (name plate missing) transformer, installed at kargali railway siding, and onsite prive maintenance of six nos. of transformers of capacity 40 kva to 100 kva, under karo ocp, bnk
Read moreComplete repairing and rewinding of one no. 150 kva 3.3 kv / 440 volt, one no. 100 kva, 3.3 kv/440v, one no. 40 kva, 3.3kv/440 volt and two no. 10 kva, 3.3 kv/220 v distribution transformer and lighting transformers of different location of kocp unde
Complete repairing and rewinding of one no. 150 kva 3.3 kv / 440 volt, one no. 100 kva, 3.3 kv/440v, one no. 40 kva, 3.3kv/440 volt and two no. 10 kva, 3.3 kv/220 v distribution transformer and lighting transformers of different location of kocp unde
Read moreMaking foundations, sheds and laying of 3.3 kv cable for the 3.3 kv by 440 v distribution transformer and its control switch, at the 3.3 kv by 440 v substation, supplying power to weighbridges no. 4 and 6, w.r.t. karo ocp, under bnk area.
Making foundations, sheds and laying of 3.3 kv cable for the 3.3 kv by 440 v distribution transformer and its control switch, at the 3.3 kv by 440 v substation, supplying power to weighbridges no. 4 and 6, w.r.t. karo ocp, under bnk area.
Read moreRepairing/overhauling of the transformer 3.3 kv/440 v rel make in jhingurda mines.
Repairing/overhauling of the transformer 3.3 kv/440 v rel make in jhingurda mines.
Read moreOnsite overhauling and repairing of the transformer 3.3 kv by 440 v, 100 kva, name plate missing transformer installed at the substation under karo ocp, bnk area.
Onsite overhauling and repairing of the transformer 3.3 kv by 440 v, 100 kva, name plate missing transformer installed at the substation under karo ocp, bnk area.
Read moreof your Industry type