Tender Details

Particulars Details
Title
Design, Engineering, Manufacturing, Testing, Supply, Stringing, Splicing, Installation, Testing And Commissioning Of Opgw Alongwith Hardware And Accessories, Termination Of Opgw At Both Ends
Description
Design, Engineering, Manufacturing, Testing, Supply, Stringing, Splicing, Installation, Testing And Commissioning Of Opgw Alongwith Hardware And Accessories, Termination Of Opgw At Both Ends 220 Kv Deoriarasara Line On Turnkey Basis Under Etd, Ballia
Organisation Government of Uttar Pradesh
Tender Id 2023_UPTCL_804751_2
Reference
Number
19/AETC/2023-24
Tender Fee 1770
EMD 48000
Tender Value -
Place AZAMGARH
Link
View Original Tender Notice

https://etender.up.nic.in

Start Date July 17, 2023 18:30
End Date
Expired 02/08/2023

Expired 1171 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply, trenching and laying of 6 quad cable along with associated accessories, jointing, testing & commissioning of complete quad cable system and laying of hdpe pipe, blowing/, drawing of ofc cable, splicing and termination of ofc along with telecom assets installation at kalamboli station in mumbai division of central railway

Supply, trenching and laying of 6 quad cable along with associated accessories, jointing, testing & commissioning of complete quad cable system and laying of hdpe pipe, blowing/, drawing of ofc cable, splicing and termination of ofc along with telecom assets installation at kalamboli station in mumbai division of central railway

Read more
Main circuit breaker (vcb) with its connector and 05 percent extra flexible reinforced rubber 27-inch-long air hose pipe i/d 5/16 with 3/8 bsp female coupling fitting at both ends as manufacturing spares to clw specification no. clw/es/c-47/i for fitment in wap-7 and wag-9 3 phase locomotives.

Main circuit breaker (vcb) with its connector and 05 percent extra flexible reinforced rubber 27-inch-long air hose pipe i/d 5/16 with 3/8 bsp female coupling fitting at both ends as manufacturing spares to clw specification no. clw/es/c-47/i for fitment in wap-7 and wag-9 3 phase locomotives.

Read more
High security welded mesh barrier,galvanized concertina barrier,galvanized barbed wire,distributed linear monitoring syatem,outdoor motorized 5 mp network imaging device,outdoor 12 core signal mode optical fiber cable,optical fiber fusion splicing termination liu odf,category 6 network cable,industrial managed network switches sfp modules media converters,central monitoring software,outdoor junction boxes, cebinets,civil works,installation testing commissionong

High security welded mesh barrier,galvanized concertina barrier,galvanized barbed wire,distributed linear monitoring syatem,outdoor motorized 5 mp network imaging device,outdoor 12 core signal mode optical fiber cable,optical fiber fusion splicing termination liu odf,category 6 network cable,industrial managed network switches sfp modules media converters,central monitoring software,outdoor junction boxes, cebinets,civil works,installation testing commissionong

Read more
Design, engineering, manufacturing, testing, supply, stringing, splicing, installation, testing and commissioning of opgw alongwith hardware and accessories, termination of opgw at both ends

Design, engineering, manufacturing, testing, supply, stringing, splicing, installation, testing and commissioning of opgw alongwith hardware and accessories, termination of opgw at both ends 220 kv deoriarasara line on turnkey basis under etd, ballia

Read more
Design, engineering, manufacturing, testing, supply, stringing, splicing, installation, testing and commissioning of opgw alongwith hardware and accessories, termination of opgw at both ends

Design, engineering, manufacturing, testing, supply, stringing, splicing, installation, testing and commissioning of opgw alongwith hardware and accessories, termination of opgw at both ends 220 kv deoriarasara line on turnkey basis under etd, ballia

Read more
Stringing, installation, testing, commissioning of opgw

Stringing, installation, testing, commissioning of opgw

Read more
Splicing of opgw of different size viz. 8/12/24/48 fibre opgw strung on 400/220/132kv transmission line towers located in different parts of mp, termination and end to end otdr testing of the opgw link before and after splicing as per requirement.

Splicing of opgw of different size viz. 8/12/24/48 fibre opgw strung on 400/220/132kv transmission line towers located in different parts of mp, termination and end to end otdr testing of the opgw link before and after splicing as per requirement.

Read more
Splicing of opgw of different size viz. 8/12/24/48 fibre opgw strung on 400/220/132kv transmission line towers located in different parts of mp, termination and end to end otdr testing of the opgw link before and after splicing as per requirement.

Splicing of opgw of different size viz. 8/12/24/48 fibre opgw strung on 400/220/132kv transmission line towers located in different parts of mp, termination and end to end otdr testing of the opgw link before and after splicing as per requirement.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise