Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design And Construction Of Elevated Viaduct And 3 Nos. Elevated Stations Including Civil, Associated Ancillary Structure, Architectural Finishes, E And M Works And Peb Structures On Balance Section Of Corridor 1 Of Agra Metro At Agra, U.P.
|
| Description |
Design And Construction Of Elevated Viaduct And 3 Nos. Elevated Stations Including Civil, Associated Ancillary Structure, Architectural Finishes, E And M Works And Peb Structures On Balance Section Of Corridor 1 Of Agra Metro At Agra, U.P.
|
| Organisation | Uttar Pradesh Metro Rail Corporation Limited | Public Sector Undertakings |
| Tender Id | 2023_UPMRC_171308_1 |
|
Reference Number |
- |
| Tender Fee | 23600 |
| EMD | 5.94 Crore |
| Tender Value | - |
| Place | AGRA |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=187649 |
| Start Date | January 25, 2024 16:30 |
| End Date |
Expired
05/02/2024
Expired 963 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreConstruction of elevated viaduct and 07 nos. elevated stations including civil, architectural finishes, water supply, external development, fire fighting, fire detection, e and m works and peb structures of corridor-2 of agra metro at agra, up india.
Construction of elevated viaduct and 07 nos. elevated stations including civil, architectural finishes, water supply, external development, fire fighting, fire detection, e and m works and peb structures of corridor-2 of agra metro at agra, up india.
Read moreDesign and construction of main line elevated viaduct from ................water supply, sanitary installation, drainage, external development, fire fighting, fire detection, e and m works and peb structures in corridor-2 of agra metro at agra, u.p.
Design and construction of main line elevated viaduct from ................water supply, sanitary installation, drainage, external development, fire fighting, fire detection, e and m works and peb structures in corridor-2 of agra metro at agra, u.p.
Read moreDdc 2-detailed design consultancy services for all structures-elevated viaduct, double decker, single decker/double decker stations etc. for corridor-1 of bangalore metro rail project, phase-3.
Detailed design consultancy services for all structures including elevated viaduct, double decker, single decker/double decker stations, entry/exit structures, loops and ramps for road flyovers, multi-modal integration structure etc. for corridor-1.
Read moreDdc 1- detailed design consultancy services for all structures including elevated viaduct, double decker, single decker/double decker stations, etc. for corridor-1 of bangalore metro rail project, phase-3.
Detailed design consultancy services for all structures including elevated viaduct, double decker, single decker/double decker stations, entry/exit structures, loops and ramps for road flyovers, multi-modal integration structure, etc. for corridor-1.
Read moreDdc 3-detailed design consultancy services for all structures-elevated viaduct, double decker, single decker/double decker stations, depots etc. for corridor-2 of bangalore metro rail project, phase-3.
Detailed design consultancy services for all structures including elevated viaduct,double decker,single decker/double decker stations,entry/exit structures,loops and ramps for road flyovers,depots,multi-modal integration structure etc. for corridor-2
Read moreDesign and construction of elevated viaduct and station for corridor 1a
Design and construction of elevated viaduct and station for corridor 1a
Read moreContract kbc3 design and construction of elevated viaduct and 10 elevated stations excluding architectural finishes, building services, link bridges and entry-exit structures of phase ii of kochi metro rail project from jln stadium to infopark.
Contract kbc3 design and construction of elevated viaduct and 10 elevated stations excluding architectural finishes, building services, link bridges and entry-exit structures of phase ii of kochi metro rail project from jln stadium to infopark.
Read morePart design and construction of elevated viaduct and six elevated (excluding architectural finishing ) from chainage 625.00 m to 7747.00 m of bhubaneswar metro phase-i mrts.
Part design and construction of elevated viaduct and six elevated (excluding architectural finishing ) from chainage 625.00 m to 7747.00 m of bhubaneswar metro phase-i mrts.
Read moreDesign and construction of elevated metro viaduct for nmrp phase-2 in
Design and construction of elevated metro viaduct for nmrp phase-2 in: i.between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii.between ch: 18218.586 m to ch: 24633.194 m of length 6.414 km in reach-3a iii.between ch: (-) 289.668 m to ch: (-) 5622.577 m of length 5.333 km in reach-4a
Read moreof your Industry type