Tender Details
Particulars | Details |
---|---|
Title |
Design And Construction Of Elevated Viaduct And 3 Nos. Elevated Stations Including Civil, Associated Ancillary Structure, Architectural Finishes, E And M Works And Peb Structures On Balance Section Of Corridor 1 Of Agra Metro At Agra, U.P.
|
Description |
Design And Construction Of Elevated Viaduct And 3 Nos. Elevated Stations Including Civil, Associated Ancillary Structure, Architectural Finishes, E And M Works And Peb Structures On Balance Section Of Corridor 1 Of Agra Metro At Agra, U.P.
|
Organisation | Uttar Pradesh Metro Rail Corporation Limited | Public Sector Undertakings |
Tender Id | 2023_UPMRC_171308_1 |
Reference Number |
|
Tender Fee | 23600 |
EMD | 5.94 Crore |
Tender Value | |
Place | AGRA |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=187649 |
Start Date | January 25, 2024 16:30 |
End Date |
05/02/2024 ( Expired 465 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Architectural finishing works including interior fitouts design and construction of external facade water supply sanitary installation, drainage for 07 elevated stations from. esic nagar to bandra of metro line 2b corridor d.n. nagar to mandale
Architectural finishing works including interior fitouts design and construction of external facade water supply sanitary installation, drainage for 07 elevated stations from. esic nagar to bandra of metro line 2b corridor d.n. nagar to mandale
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreArchitectural finishing and phe works for 6 elevated stations of pkg-2 and pkg-3, phase-2b
Architectural finishing and 
 public health engineering works for 6 elevated stations viz, hebbal, kodigehalli, jakkur cross, yelahanka, 
 bagalur cross of package-2 and doddajala of package-3, in phase 2b line of bangalore metro rail project.
Read moreMaintenance of civil work addition, alteration modification of various building, viaduct and stations from qutub minar to arjangarh metro stations including qutub minar ramp and sultanpur depot in line-2. (for 3 years).
Maintenance of civil work addition, alteration modification of various building, viaduct and stations from qutub minar to arjangarh metro stations including qutub minar ramp and sultanpur depot in line-2. (for 3 years).
Read moreDesign and construction of underground stations at market yard, padmavati , katraj stations & associated tunnels in stage-i and stations at bibwewadi & balaji nagar in stage-ii swargate-katraj section of pune metro rail project
Design and construction of underground stations at market yard, padmavati , katraj stations & associated tunnels in stage-i and stations at bibwewadi & balaji nagar in stage-ii swargate-katraj section of pune metro rail project
Read moreDismental of old building/structures at civil line area 09 nos i-type quarters, e and m work shop building situated at vidisha and removing of dismantled material and additional stacked material from the campus area and rendering entire campus plain
Dismental of old building/structures at civil line area 09 nos i-type quarters, e and m work shop building situated at vidisha and removing of dismantled material and additional stacked material from the campus area and rendering entire campus plain
Read moreRepair and maintenance of canal gates section 1 ashti section 2 talegaon2 section 3 arvi 2 section talegaon 1 section 5 arvi of size 0.3 x 0.3 m 199 nos 0.45 x 0.45 m 21 nos 0.60 x 0.60 m 02 nos d.o of mentioned size at left bank canal on variou
Repair and maintenance of canal gates section 1 ashti section 2 talegaon2 section 3 arvi 2 section talegaon 1 section 5 arvi of size 0.3 x 0.3 m 199 nos 0.45 x 0.45 m 21 nos 0.60 x 0.60 m 02 nos d.o of mentioned size at left bank canal on variou
Read moreArchitectural finishing works including dfse and roof sheeting of pre-engineered building (peb) structures and dc of external facade, ws, si, drainage, site development works at four (04) elevated stations of line-10 of delhi mrts phase-iv project.
Architectural finishing works including dfse and roof sheeting of pre-engineered building (peb) structures and dc of external facade, ws, si, drainage, site development works at four (04) elevated stations of line-10 of delhi mrts phase-iv project.
Read moreDesign and construction of skywalk including peb, architectural finishing and e and m works at anand vihar namo bharat station of delhi-ghaziabad-meerut namo bharat corridor
Design and construction of skywalk including peb, architectural finishing and e and m works at anand vihar namo bharat station of delhi-ghaziabad-meerut namo bharat corridor
Read moreof your Industry type