Tender Details
Particulars | Details |
---|---|
Title |
[I]Modification Of Ohe Due To Proposed Rub Of Nhai At Km150/06 08 Between Kmlm Hsra Stations. [Ii] Ohe Modifications In Connection With Proposed Rob At Km 153 Kmlm &Amp Hsra Stations In Sa Sbc Section. [Iii] Ohe Modifications In Connection With Proposed Bmrcl Overhead Structure(metro Viaduct) At Km.205/300 400 Near Baiyappanahalli.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 76627803 |
Reference Number |
B-TRD-29-2024-25-OT-14 |
Tender Fee | 0 |
EMD | 29600 |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/102024/76627803/viewNitPdf_4667942.pdf |
Start Date | October 08, 2024 18:36 |
End Date |
30/10/2024 ( Expired 173 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
(a)design, supply, erection, testing & commissioning of 25 kv ac, single phase ohe including modification in existing ohe, due to construction of rob at lc no.81 (between ghoti-padali),87 (between devlali-nashik rd), 93a (between odha-kherwadi),94 (between odha-kherwadi),98 (between kasabesukene-niphad) , 101(between niphad-ugaon) & 88 (village road) at km 185/28-30(dvl-nkrd) (b) removal of lt , ht infringement in connection with construction of rob/rub work in bhusawal division of
For complete deion and other details, please refer to tender
Read more[i] ohe modification in connection with platform extension at pcv [ii] sbc-sa section: construction of track machine siding at ryc station in aden/dpj section-ohe modifications [iii] trd works in connection with engineering track works in bypl- oml section.[iv] sbc-sa sec: complete track renewal (p) of existing 52kg rails on 52kg psc of 1540 nos/km with 60kg/90uts rails and 60kg wider base sleeper of 1660/km for a length of 15.5 km from km 66/500-72/0 and 77/0-87/00 (sl) in aden/dpj section.
For complete deion and other details, please refer to tender
Read moreConstruction of road over bridge (rob) on mathara junction (km 5.081) along with service road drains etc. in connection with in connection with devlopement for sasti pandharpauni line to facilitate coal evacuation from proposed chp silo at sasti ocm
Construction of road over bridge (rob) on mathara junction (km 5.081) along with service road drains etc. in connection with in connection with devlopement for sasti pandharpauni line to facilitate coal evacuation from proposed chp silo at sasti ocm
Read more[i] bypl-dmm section- ohe modifications in connection with construction of foot over bridge (fob) at km 24/600/700 at rajanukunti (rnn) yard near rob no.497-a for pedestrian movement (3m wide & 4 track crossing). [ii]ohe modification in bangalore city - dharmavaram - ttr (twswcmsc) - 8 nos at ynk yard. [iii] ohe modification required for construction of track machine siding at repi, sspn and tdv station length of 420m [iv]ohe modifications in connection with engineering track works in sbc
For complete deion and other details, please refer to tender
Read more[i]modification of ohe due to proposed rub of nhai at km150/06-08 between kmlm-hsra stations. [ii] ohe modifications in connection with proposed rob at km 153 kmlm & hsra stations in sa-sbc section. [iii] ohe modifications in connection with proposed bmrcl overhead structure(metro viaduct) at km.205/300-400 near baiyappanahalli.
For complete deion and other details, please refer to tender
Read moreBalance work of construction of proposed 4 lane rob and its approaches in lieu of existing level crossing no.124e/spl3 at km 1.800 on nh 205 between prasannayapalle n zangalapalle railway stations on anantapur dharmavaram railway section in the stat
Balance work of construction of proposed 4 lane rob and its approaches in lieu of existing level crossing no.124e/spl3 at km 1.800 on nh 205 between prasannayapalle n zangalapalle railway stations on anantapur dharmavaram railway section in the stat
Read moreGuntakal division - ohe modifications in connection with proposed construction of rub no.512-a of size 2x5.0x4.5m(twin box) rcc box in lieu of lc no.120 at km 260/11-13 between krishnapuram and kadapa stations by box pushing method
For complete deion and other details, please refer to tender
Read moreSw-i :- guntakal division-proposed redevelopment of anantapur, madanapalle, kadiri and pakala stations under amrit bharat station scheme-ohe modification works. sw- ii :- guntakal division - (i) modification works to ohe in connection with widening of existing 2-lane rob to 4-lane rob with paved shoulder at railway km 347/31-35 between regadipalli and vanganur stations on gy-ru section and (ii) modification works to ohe in connection with proposed construction of two lane road over bridge (r
For complete deion and other details, please refer to tender
Read moreOhe modification works in connection with construction of rob at km no. 449/26-30 between patasahi-bimalgarh stations under bondamunda-barsuan section for rimuli-rajamunda section of nh-215 in ckp division.
For complete deion and other details, please refer to tender
Read more[i]sbc-sa section: construction of track machine siding at ryc station in aden/dpj section -ohe modifications. [ii] bangalore city - dharmavaram - ttr (twswcmsc) - 8 nos at ynk yard - ohe modifications.[iii]sbc-division-construction of track machine siding at 15 stations for a length of 420m at 15 minor stations in sbc division [iv] trd works in connection with engineering track works.
For complete deion and other details, please refer to tender
Read moreof your Industry type