Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
[I]Modification Of Ohe Due To Proposed Rub Of Nhai At Km150/06 08 Between Kmlm Hsra Stations. [Ii] Ohe Modifications In Connection With Proposed Rob At Km 153 Kmlm &Amp Hsra Stations In Sa Sbc Section. [Iii] Ohe Modifications In Connection With Proposed Bmrcl Overhead Structure(metro Viaduct) At Km.205/300 400 Near Baiyappanahalli.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 76627803 |
|
Reference Number |
B-TRD-29-2024-25-OT-14 |
| Tender Fee | 0 |
| EMD | 29600 |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/102024/76627803/viewNitPdf_4667942.pdf |
| Start Date | October 08, 2024 18:36 |
| End Date |
Expired
30/10/2024
Expired 717 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Additions and alterations to ohe in connection with provision of cops at ee,tel,bpp,clx stations and ohe modifications for the construction of new electrical office and other amenities at eluru under the jurisdiction of sr.den/central/bza in bza division.
Additions and alterations to ohe in connection with provision of cops at ee,tel,bpp,clx stations and ohe modifications for the construction of new electrical office and other amenities at eluru under the jurisdiction of sr.den/central/bza in bza division.
Read moreOhe modification work in connection with proposed machine siding at crx station under the work carron yard- provision of track machine siding and facilities.
Ohe modification work in connection with proposed machine siding at crx station under the work carron yard- provision of track machine siding and facilities.
Read moreTvc division - ohe modification in connection with construction of rob for nhai at km 55/3-4 between alappuzha and tumboli stations and at km 57/13-14 between alappuzha and punnapra stations in ernakulam - kayankulam section
Tvc division - ohe modification in connection with construction of rob for nhai at km 55/3-4 between alappuzha and tumboli stations and at km 57/13-14 between alappuzha and punnapra stations in ernakulam - kayankulam section
Read moreDesign, supply, erection testing and commissioning of 25 kv, single phase, ac ohe works in connection with the provision of high level platform at niphad stations in bhusawal division.
Design, supply, erection testing and commissioning of 25 kv, single phase, ac ohe works in connection with the provision of high level platform at niphad stations in bhusawal division.
Read more(1) provision of standard cantilever arrangement on platforms in mys and cta depots jurisdiction.(2) ohe modification in connection with proposed construction of road under bridge (rcc box with opening of size 1x7.5mx5m) in lieu of lc no.72 at km 122/500-600 between bsn-rdi stations. (launching by crane method) bridge no.119
(1) provision of standard cantilever arrangement on platforms in mys and cta depots jurisdiction.(2) ohe modification in connection with proposed construction of road under bridge (rcc box with opening of size 1x7.5mx5m) in lieu of lc no.72 at km 122/500-600 between bsn-rdi stations. (launching by crane method) bridge no.119
Read more25 kv ohe & allied works in connection with developmental works at ranaghat and balanced development works at sealdah, shantipur, krishnanagar, bethuadahari, behrampur court, sonarpur, canning, naihati, kalyani, kalyani ghospara, dum-dum junction, barrackpore, chandpara, bangaon and gede stations under amrit bharat station scheme in sealdah division of eastern railway
25 kv ohe & allied works in connection with developmental works at ranaghat and balanced development works at sealdah, shantipur, krishnanagar, bethuadahari, behrampur court, sonarpur, canning, naihati, kalyani, kalyani ghospara, dum-dum junction, barrackpore, chandpara, bangaon and gede stations under amrit bharat station scheme in sealdah division of eastern railway
Read moreOhe arrangements in connection with 1. layout correction for point no. 58a, 58b and trap no. 108 at walayar yard. 2. provision of track machine stabling facilities at palakkad and kuttipuram stations. 3.provision of 6m wide fob connecting platforms and second entry at shoranur station under amrit bharat scheme.
Ohe arrangements in connection with 1. layout correction for point no. 58a, 58b and trap no. 108 at walayar yard. 2. provision of track machine stabling facilities at palakkad and kuttipuram stations. 3.provision of 6m wide fob connecting platforms and second entry at shoranur station under amrit bharat scheme.
Read moreSouth coast railway - construction organization - construction of new bg line between vaddamanu (incl.) and namburu (incl.) stations from km.29.75 to km.58.102 (28.352 km) including civil, electrical (ohe & ge) & signalling works with kavach in connection with new bg line between errupalem - namburu via amaravati of guntur division of south coast railway in the state of andhra pradesh.
South coast railway - construction organization - construction of new bg line between vaddamanu (incl.) and namburu (incl.) stations from km.29.75 to km.58.102 (28.352 km) including civil, electrical (ohe & ge) & signalling works with kavach in connection with new bg line between errupalem - namburu via amaravati of guntur division of south coast railway in the state of andhra pradesh.
Read moreConstruction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi
Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi
Read moreConstruction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi
Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi
Read moreof your Industry type