Tender Details
Particulars | Details |
---|---|
Title |
Repair Of Head Shaft Assembly Of Gyratory Crusher (Phase I Chp) Including Supply, Installation, Testing, And Commissioning Of Head Mantle Liners (Upper, Intermediate And Lower) And Repairing Of Damaged Thread Of Head Shafts Upper Portion, Dudhichua.
|
Description |
Repair Of Head Shaft Assembly Of Gyratory Crusher (Phase I Chp) Including Supply, Installation, Testing, And Commissioning Of Head Mantle Liners (Upper, Intermediate And Lower) And Repairing Of Damaged Thread Of Head Shafts Upper Portion, Dudhichua.
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 2.92 Lakh |
Tender Value | |
Place | DUDHICHUA, NCL |
Link |
AAAAAAAAAA Login to view |
Start Date | May 21, 2025 16:30 |
End Date |
05/06/2025 ( 16 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Supply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreRepair of head shaft assembly of gyratory crusher (phase-i chp) including supply, installation, testing, and commissioning of head mantle liners (upper, intermediate and lower) and repairing of damaged thread of head shafts upper portion, dudhichua.
Repair of head shaft assembly of gyratory crusher (phase-i chp) including supply, installation, testing, and commissioning of head mantle liners (upper, intermediate and lower) and repairing of damaged thread of head shafts upper portion, dudhichua.
Read moreDismantling, supply, installation, testing and commissioning of air conditioning units at technopark phase i, trivandrum.
Dismantling, supply, installation, testing and commissioning of air conditioning units at technopark phase i, trivandrum.
Read moreRetrofitting with installation, testing and commissioning of non-directional over current relays for auxiliary transformers of phase-i and ii elevated ass.
Retrofitting with installation, testing and commissioning of non-directional over current relays for auxiliary transformers of phase-i and ii elevated ass.
Read moreTender for suuply ofeuipment material design erection testing and commissioning for providing shifting of existing three phase lt line in lower julahkri in hardaspura under esd hpsebl chamba no i
Tender for suuply ofeuipment material design erection testing and commissioning for providing shifting of existing three phase lt line in lower julahkri in hardaspura under esd hpsebl chamba no i
Read moreSupply, installation, testing and commissioning of scan head (galvo head) for uno-i
Supply, installation, testing and commissioning of scan head (galvo head) for uno-i
Read moreRepairing /rewinding with fixing and testing at site of 05 no brake coils of electric hoist, 3 nos thrust brake, 2 no 1500 va, 2 nos 1000va rating control transformers and one no 200 amp single phase welding machine installed at chp, dudhichua
Repairing /rewinding with fixing and testing at site of 05 no brake coils of electric hoist, 3 nos thrust brake, 2 no 1500 va, 2 nos 1000va rating control transformers and one no 200 amp single phase welding machine installed at chp, dudhichua
Read moreGap adjustment of gyratory crusher no. 02 ( 1500 tph) installed at phase-i chp, dudhichua project
Gap adjustment of gyratory crusher no. 02 ( 1500 tph) installed at phase-i chp, dudhichua project
Read moreSupply, dismantling erection testing and commissioning of existing hydraulic rail clamp assembly for thyssenkrupp make stacker cum reclaimer of conveyor 8a installed at 4x210 mw chp i at sgtps, mppgcl, birsinghpur
Supply, dismantling erection testing and commissioning of existing hydraulic rail clamp assembly for thyssenkrupp make stacker cum reclaimer of conveyor 8a installed at 4x210 mw chp i at sgtps, mppgcl, birsinghpur
Read moreof your Industry type