Tender Details

Particulars Details
Title
Repair Of Head Shaft Assembly Of Gyratory Crusher (Phase I Chp) Including Supply, Installation, Testing, And Commissioning Of Head Mantle Liners (Upper, Intermediate And Lower) And Repairing Of Damaged Thread Of Head Shafts Upper Portion, Dudhichua.
Description
Repair Of Head Shaft Assembly Of Gyratory Crusher (Phase I Chp) Including Supply, Installation, Testing, And Commissioning Of Head Mantle Liners (Upper, Intermediate And Lower) And Repairing Of Damaged Thread Of Head Shafts Upper Portion, Dudhichua.
Organisation Northern Coalfields Limited | Public Sector Undertakings
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 2.92 Lakh
Tender Value
Place DUDHICHUA, NCL
Link

AAAAAAAAAA

Login to view
Start Date May 21, 2025 16:30
End Date

05/06/2025 ( 16 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Supply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.

Supply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.

Read more
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Read more
Repair of head shaft assembly of gyratory crusher (phase-i chp) including supply, installation, testing, and commissioning of head mantle liners (upper, intermediate and lower) and repairing of damaged thread of head shafts upper portion, dudhichua.

Repair of head shaft assembly of gyratory crusher (phase-i chp) including supply, installation, testing, and commissioning of head mantle liners (upper, intermediate and lower) and repairing of damaged thread of head shafts upper portion, dudhichua.

Read more
Dismantling, supply, installation, testing and commissioning of air conditioning units at technopark phase i, trivandrum.

Dismantling, supply, installation, testing and commissioning of air conditioning units at technopark phase i, trivandrum.

Read more
Retrofitting with installation, testing and commissioning of non-directional over current relays for auxiliary transformers of phase-i and ii elevated ass.

Retrofitting with installation, testing and commissioning of non-directional over current relays for auxiliary transformers of phase-i and ii elevated ass.

Read more
Tender for suuply ofeuipment material design erection testing and commissioning for providing shifting of existing three phase lt line in lower julahkri in hardaspura under esd hpsebl chamba no i

Tender for suuply ofeuipment material design erection testing and commissioning for providing shifting of existing three phase lt line in lower julahkri in hardaspura under esd hpsebl chamba no i

Read more
Supply, installation, testing and commissioning of scan head (galvo head) for uno-i

Supply, installation, testing and commissioning of scan head (galvo head) for uno-i

Read more
Repairing /rewinding with fixing and testing at site of 05 no brake coils of electric hoist, 3 nos thrust brake, 2 no 1500 va, 2 nos 1000va rating control transformers and one no 200 amp single phase welding machine installed at chp, dudhichua

Repairing /rewinding with fixing and testing at site of 05 no brake coils of electric hoist, 3 nos thrust brake, 2 no 1500 va, 2 nos 1000va rating control transformers and one no 200 amp single phase welding machine installed at chp, dudhichua

Read more
Gap adjustment of gyratory crusher no. 02 ( 1500 tph) installed at phase-i chp, dudhichua project

Gap adjustment of gyratory crusher no. 02 ( 1500 tph) installed at phase-i chp, dudhichua project

Read more
Supply, dismantling erection testing and commissioning of existing hydraulic rail clamp assembly for thyssenkrupp make stacker cum reclaimer of conveyor 8a installed at 4x210 mw chp i at sgtps, mppgcl, birsinghpur

Supply, dismantling erection testing and commissioning of existing hydraulic rail clamp assembly for thyssenkrupp make stacker cum reclaimer of conveyor 8a installed at 4x210 mw chp i at sgtps, mppgcl, birsinghpur

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise