Tender Details

Particulars Details
Title
A/Mtc Of L/S Work In Sector 27, Panchkula (Supply Of Heavy Duty Rubber Hose Pipe 1 Dia And Complete In All Respect.)
Description
A/Mtc Of L/S Work In Sector 27, Panchkula (Supply Of Heavy Duty Rubber Hose Pipe 1 Dia And Complete In All Respect.)
Organisation Haryana Board Corporation | State Govt. and UT
Tender Id 2025_HBC_445886_1
Reference
Number
2025FB5BA984 D60E 49E9 9AA4 2BCACB279D4A263HSV
Tender Fee 1430
EMD 1980
Tender Value
Place Panchkula
Link https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=523341
Start Date May 09, 2025 23:30
End Date

19/05/2025 ( Expired 40 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Pinjore town, a/mtc estimat...

Amtc estimate of sewerage scheme pinjore town. operation and maintenance of 5.00 mld stp mps fecal sludge tank/ laboratory based on mbbr plus ttp technology for civil work elect and mech installation watch and ward etc complete in all respect a

Read more
(nib_07) work of improvement in drinking water supply of 11 villages of pali and 2 villages of rani by connecting them to gundoj off take through sodawas filter plant under mla constituency sumerpur including 5 year o and m after 1 year defect liabil

(nib_07) work of improvement in drinking water supply of 11 villages of pali and 2 villages of rani by connecting them to gundoj off take through sodawas filter plant under mla constituency sumerpur including 5 year o and m after 1 year defect liabil

Read more
Design and construction of 120 mtr span steel superstructure (through type) major pmt bridge completed in all respect over peepani-ii nallah at km 32.200 on road hayuliang metaliang chaglohagam road of 1444 bcc sector under 48 tf in arunachal pradesh

Design and construction of 120 mtr span steel superstructure (through type) major pmt bridge completed in all respect over peepani-ii nallah at km 32.200 on road hayuliang-metaliang-chaglohagam road of 1444 bcc sector under 48 tf in arunachal pradesh

Read more
Reapir maint of ht electric supply distribution system, transformer, vcbs, acbs, apfc panel, ht joints. lt pane, xlpe cable and other connected work incl fixing of stores in tech area at 27 ed and 31 mcu at af stn palam under ge (af) gurgaon no.1

Reapir maint of ht electric supply distribution system, transformer, vcbs, acbs, apfc panel, ht joints. lt pane, xlpe cable and other connected work incl fixing of stores in tech area at 27 ed and 31 mcu at af stn palam under ge (af) gurgaon no.1

Read more
Laying of pipe line for water supply and execution of other work in different location at site ward no. 51 file no. 187/25x9/1

Laying of pipe line for water supply and execution of other work in different location at site ward no. 51 file no. 187/25x9/1

Read more
Internal improvement works of various 8 nos. dhani seed farm pacca water supply schemes block abohar distt. fazilka (under nabard xxvii/jjm) package-18

1 no. construction of new ohsr (400 cum), construction of new pump chamber 6.10m x 4.88m, distribution system, providing and fixing of new household connection and development of water works site etc. complete in all respect

Read more
Internal improvement works of section no. s-408 (package-5) for water supply scheme 1. khuban and modi khera, block abohar, distt. fazilka (under nabard xxvii/jjm)

Repair of old ohsr (250 cum), repair of pump chamber 6.10m x 4.88m, distribution system, providing and fixing household connection and site laying at head works (boundary wall, footpath etc.) complete in all respect and all other works contgent the

Read more
Work contract for complete operation and assistance in operation work of hydrogen generation plant stage-1 and stage-2 at sstpp, mppgcl, dongalia for a period of 12 month

Work contract for complete operation and assistance in operation work of hydrogen generation plant stage-1 and stage-2 at sstpp, mppgcl, dongalia for a period of 12 month

Read more
Supply installation commissioning and complete testing of 12kwp grid connected solar pv roof top system complete in all respect in all respect for new marketing office building panchkula

Supply installation commissioning and complete testing of 12kwp grid connected solar pv roof top system complete in all respect in all respect for new marketing office building panchkula

Read more
Providing and laying flooring in new shed for culinary automated beverage and pet bottling unit in plant of pagrexco from earth work to providing vitrified and heavy duty tiles including ss modular channel system in floor etc distt hsp hsp_2025_031

Providing and laying flooring in new shed for culinary automated beverage and pet bottling unit in plant of pagrexco from earth work to providing vitrified and heavy duty tiles including ss modular channel system in floor etc distt hsp hsp_2025_031

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise