Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Excavation Loading And Transportation Of Raw Sand From The Different Locations Of Mining Areas
|
| Description |
Excavation Loading And Transportation Of Raw Sand From The Different Locations Of Mining Areas
|
| Organisation | Indian Rare Earths Limited | Central Govt. Ministry/Department |
| Tender Id | 2025_IRELD_798911_1 |
|
Reference Number |
GEM/2025/B/6238349 |
| Tender Fee | 0 |
| EMD | 80.64 Lakh |
| Tender Value | - |
| Place | IREL (India) Limited, OSCOM , Matikhalo |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1103531 |
| Start Date | May 21, 2025 19:30 |
| End Date |
Expired
11/06/2025
Expired 487 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of spares for pressure, temperature and flow switches in various locations of boiler and turbine areas
Supply of spares for pressure, temperature and flow switches in various locations of boiler and turbine areas
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreMaintenance of existing 10,000 nos plants at different locations around the pond -1 and pond -2 areas including providing tractor mounted water tanker for watering the plantation at btps ash pond from october 2026 to march 2027
Maintenance of existing 10,000 nos plants at different locations around the pond -1 and pond -2 areas including providing tractor mounted water tanker for watering the plantation at btps ash pond from october 2026 to march 2027
Read moreProviding temporary lighting arrangements on hire basis for celebration of bathkamma and dasara festival on 18.10.2026 and 20.10.2026 at various locations in hanamkonda areas
Providing temporary lighting arrangements on hire basis for celebration of bathkamma and dasara festival on 18.10.2026 and 20.10.2026 at various locations in hanamkonda areas
Read moreProviding temporary lighting arrangements on hire basis for celebration of bathkamma and dasara festival on 18.10.2026 and 20.10.2026 at various locations under fort warangal areas
Providing temporary lighting arrangements on hire basis for celebration of bathkamma and dasara festival on 18.10.2026 and 20.10.2026 at various locations under fort warangal areas
Read moreReconstruction of collapsed & damaged boundary wall at different locations of periphery and strengthening of tilted boundary wall near tali of kajra solar plant, lakhisarai.
Reconstruction of collapsed & damaged boundary wall at different locations of periphery and strengthening of tilted boundary wall near tali of kajra solar plant, lakhisarai.
Read moreTggenco-ytps-construction of cabins for o and m staff shift operations at various locations of the tg building and boiler-1 and 2 areas at stage-i of ytps
Tggenco-ytps-construction of cabins for o and m staff shift operations at various locations of the tg building and boiler-1 and 2 areas at stage-i of ytps
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreSupplying and spreading of stone dust and sand at various locations on occasion of saddula bathukamma festival in div 22 of municipal corporation karimnagar est. cost of rs. 0.80 lakhs under mgf
Supplying and spreading of stone dust and sand at various locations on occasion of saddula bathukamma festival in div 22 of municipal corporation karimnagar est. cost of rs. 0.80 lakhs under mgf
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreof your Industry type