Tender Details
Particulars | Details |
---|---|
Title |
Continuing The Services Of 34 Nos Of Nac Siite Engineers Deployed Through Nac Under Phase Ii Of Package 4 For The Period I.E., From 01 01 2025 To 31 10 2025 (10 Months) In Ghmc
|
Description |
Continuing The Services Of 34 Nos Of Nac Siite Engineers Deployed Through Nac Under Phase Ii Of Package 4 For The Period I.E., From 01 01 2025 To 31 10 2025 (10 Months) In Ghmc
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 560787 |
Reference Number |
10/SE(H)/GHMC/2024-25, Date: 02-12-2024 |
Tender Fee | 3970 |
EMD | 99240 |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | December 04, 2024 23:00 |
End Date |
12/12/2024 ( Expired 181 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Hiring the services of 1 number brand new ambulance with ac force trax cruiser ambulance 5 plus d plus p seater capacity 2wd diesel driven bs vi model or equivalent for a period of 4 years under medical section at ps8 sonapur oil india limited west bengal w e f 01 09 2025
Hiring the services of 1 number brand new ambulance with ac force trax cruiser ambulance 5 plus d plus p seater capacity 2wd diesel driven bs vi model or equivalent for a period of 4 years under medical section at ps8 sonapur oil india limited west bengal w e f 01 09 2025
Read moreIe services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreIe services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham
Ie services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham
Read moreEngagement outsourcing of manpower for operational work of grid sub stations day to day works at tc transmission central store dumka at deoghar inspection bungalow and offices under transmission zone ii dumka for the period from 01 07 2025 to 31 03
Engagement outsourcing of manpower for operational work of grid sub stations day to day works at tc transmission central store dumka at deoghar inspection bungalow and offices under transmission zone ii dumka for the period from 01 07 2025 to 31 03
Read moreHiring the services of one number brand new mahindra bolero b4 with ac, 7 seater, diesel driven bs vi model or equivalent for use in row patrolling of mainline from plkm0.0 to plkm34.0 and branch line from plkm0.0 to plkm38.0 under pump station 1 jurisdiction for a period of 4 years
Hiring the services of one number brand new mahindra bolero b4 with ac, 7 seater, diesel driven bs vi model or equivalent for use in row patrolling of mainline from plkm0.0 to plkm34.0 and branch line from plkm0.0 to plkm38.0 under pump station 1 jurisdiction for a period of 4 years
Read moreAnnual housekeeping work of 220 132 33 kv grid sub station lalmatia for the period from 01 07 2025 to 31 03 2026 i e 9 months for f y 2025 26
Annual housekeeping work of 220 132 33 kv grid sub station lalmatia for the period from 01 07 2025 to 31 03 2026 i e 9 months for f y 2025 26
Read moreCarrying out patrolling routine breakdown maintenance of 220kv dumka rupnarayanpur d c transmission line under transmission sub division madanpur for the f y 2025 26 i e from 01 07 2025 to 31 03 2026 i e 09 months
Carrying out patrolling routine breakdown maintenance of 220kv dumka rupnarayanpur d c transmission line under transmission sub division madanpur for the f y 2025 26 i e from 01 07 2025 to 31 03 2026 i e 09 months
Read moreCarrying out patrolling routine breakdown maintenance of 132kv dumka lalmatia total nos of tower 322 57 lilo tower transmission line under transmission sub division dumka for the f y 2025 26 i e from 01 07 2025 to 31 03 2026
Carrying out patrolling routine breakdown maintenance of 132kv dumka lalmatia total nos of tower 322 57 lilo tower transmission line under transmission sub division dumka for the f y 2025 26 i e from 01 07 2025 to 31 03 2026
Read moreCarrying out patrolling routine breakdown maintenance of 220 kv d c dumka govindpur transmission line 50 85 km under transmission sub division madanpur for the f y 2025 26 i e from 01 07 2025 to 31 03 2026 i e 09 months
Carrying out patrolling routine breakdown maintenance of 220 kv d c dumka govindpur transmission line 50 85 km under transmission sub division madanpur for the f y 2025 26 i e from 01 07 2025 to 31 03 2026 i e 09 months
Read moreof your Industry type