Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Maintenance Work Of Internal Sewerage System For 36 Months In Zone 8, Village Sadopur, Badalpur, Connection 2 10 Mld Stp, Greater Noida.
|
| Description |
Maintenance Work Of Internal Sewerage System For 36 Months In Zone 8, Village Sadopur, Badalpur, Connection 2 10 Mld Stp, Greater Noida.
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_GNIDA_866633_8 |
|
Reference Number |
SM/(E-TENDER CELL)/2023/481 DATE-28.11.2023 |
| Tender Fee | 2490 |
| EMD | 2.61 Lakh |
| Tender Value | - |
| Place | GREATER NOIDA INDUSTRIAL DEVELOPMENT AUTHORITY |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | December 04, 2023 23:30 |
| End Date |
Expired
18/12/2023
Expired 1031 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Barana and babail- providing sewerage facility, construction of 3 mld stp
Providing sewerge facility, construction of 3.00 mld stp for barana and babail installation of tube wells and laying the di pipe line
Read moreA/mtc. estimate for sewerage scheme and 4.5 mld stp at hathin town
O and m dnit for three months maintenance sewerage work in hathin town and all other work contingent thereto
Read moreA/mtc. estimate for sewerage scheme and 4.5 mld stp at hathin town
Operation and maintenance sewerage system including de-silting of s.w and rcc sewer, repairing and manhole and fixing of missing manhole cover etc. hathin town and all other works contingent thereto (for three year)
Read more3 mld stp and sewerage work at raja sansi town district amritsar under sbm 2.0
Prov. sew. scheme, house conn, rest. of rd, mps and const, inst, comm. of 3 mld stp cum fstp 9 kld based on any suitable, sust, proven bio. tech. incl. other appurt. works on turnkey basis as per dnit incl. o and m for 60 months after stablization
Read moreInterception and diversion i and d of sewerage network, mps, 1 mld stp and fstp at fatehgarh panjtur distt. moga
Interception and diversion i and d of sewerage network, mps, 1 mld stp and fstp at fatehgarh panjtur distt. moga
Read moreInterception and diversion i and d of sewerage network,mps 2 mld stp and fstp at nihal singh wala distt. moga
Interception and diversion i and d of sewerage network,mps 2 mld stp and fstp at nihal singh wala distt. moga
Read moreAnnual repair and operation and maintenance of sewerage treatment plant kunihar area in tehsil arki district solan hp sh deployment of labour_staff for operation running and maintenance of 0.90 mld capacity stp including sewerage network system to k
Sh deployment of labour_staff for operation running and maintenance of 0.90 mld capacity stp including sewerage network system to kunihar area for a period of 18 months
Read moreStrengthening of 1400 mm dia duplicate sewer main and restrict the entry of sewerage flows into river musi by constructing suitable diversion and pipe carrying supported structures on either sides of foot over bridge at mgbs bus station and afzalsagar iandd under trunk lines of 339 mld amberpet stp under pd-i
Strengthening of 1400 mm dia duplicate sewer main and restrict the entry of sewerage flows into river musi by constructing suitable diversion and pipe carrying supported structures on either sides of foot over bridge at mgbs bus station and afzalsagar iandd under trunk lines of 339 mld amberpet stp under pd-i
Read moreEpc and performance run followed by o and m of stp of 50 mld capacity based on sbr technology at nevta including 3 months trial run and 1 year o and m and after with 10 years o and m for ward 65 66 67 bhankrota and surrounding nearby areas upto nevta
Epc and performance run followed by o and m of stp of 50 mld capacity based on sbr technology at nevta including 3 months trial run and 1 year o and m and after with 10 years o and m for ward 65 66 67 bhankrota and surrounding nearby areas upto nevta
Read moreSupply,installation,testing and commissioning ocems and flow meter including five year running,operation and maintenance of period 60 months,at 137 mld stp kasna,15mld stp sec-ecotech-2,20mld stp sec-ecotech-3,2/10 mld stp sadopur,badalpur,gr noida
Supply,installation,testing and commissioning ocems and flow meter including five year running,operation and maintenance of period 60 months,at 137 mld stp kasna,15mld stp sec-ecotech-2,20mld stp sec-ecotech-3,2/10 mld stp sadopur,badalpur,gr noida
Read moreof your Industry type