Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rotating Equipment Overhauling During U3 Oh And U5 Oh
|
| Description |
Rotating Equipment Overhauling During U3 Oh And U5 Oh
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2024_WBPDC_653730_1 |
|
Reference Number |
WBPDCL/BKTPP/NIT/E2909/23-24 |
| Tender Fee | 0 |
| EMD | 9999 |
| Tender Value | - |
| Place | Bakreswar Thermal Power Project |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1412951 |
| Start Date | February 03, 2024 16:30 |
| End Date |
Expired
17/02/2024
Expired 968 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Tggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Read moreTggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27
Tggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27
Read moreBmd-service charges towards deputation of service engineers for supervising the overhauling works of boiler burners, safety valves, hangers and soot blowing system of 1x 500mw boiler during coh works for the year 2026-27
Bmd-service charges towards deputation of service engineers for supervising the overhauling works of boiler burners, safety valves, hangers and soot blowing system of 1x 500mw boiler during coh works for the year 2026-27
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreRotating equipment overhauling during u3 oh and u5 oh
Rotating equipment overhauling during u3 oh and u5 oh
Read moreOverhauling of coal pipe vane damper etc during oh of u3
Overhauling of coal pipe vane damper etc during oh of u3
Read moreBhe/pw/pur/ukt-mm-u3-u5/2976
Refurbishment / redevelopment work of close sheds and open yard including tree plantation at u-3 (200 mw)and u-5 (210 mw) gsecl ukai tps
Read moreBhe/pw/pur/ukt-mm-u3-u5/2920
Refurbishment / redevelopment work of close sheds and open yard including tree plantation at u-3 (200 mw)and u-5 (210 mw) gsecl ukai tps
Read moreService contract for overhauling of cw pump3b and3c of stgii during u3 oh period25 at sgtpp
Service contract for overhauling of cw pump3b and3c of stgii during u3 oh period25 at sgtpp
Read moreof your Industry type