Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Cwr (Capacity 300 Kl) And Laying Of Pipeline Work At Ward No 66, Auli Raipur, Dehradun
|
Description |
Construction Of Cwr (Capacity 300 Kl) And Laying Of Pipeline Work At Ward No 66, Auli Raipur, Dehradun
|
Organisation | CGM (Drinking Water) Jal Sansthan | State Govt. and UT |
Tender Id | 2024_UKJS_77401_3 |
Reference Number |
894/E-Tender/2024-25 dated 28-10-2024 |
Tender Fee | 4720 |
EMD | 4.16 Lakh |
Tender Value | |
Place | Dehradun |
Link | https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=92317 |
Start Date | October 29, 2024 16:30 |
End Date |
11/11/2024 ( Expired 195 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreDpr for construction of grade separators at sarona chowk (ch. 279.750) udyog bhawan (269.000) telibandha chowk (ch. 268.000) on raipur city portion of nh53 at raipur aurang section and ape(10.700) chowk of nh-30 raipur kodebad in chhattisgarh
Dpr for construction of grade separators at sarona chowk (ch. 279.750) udyog bhawan (269.000) telibandha chowk (ch. 268.000) on raipur city portion of nh53 at raipur aurang section and ape(10.700) chowk of nh-30 raipur kodebad in chhattisgarh
Read moreConstruction of boundary wall and paver block work ganesh garden shyampur road ward no 22
Construction of boundary wall and paver block work ganesh garden shyampur road ward no 22
Read moreConstruction of remaining work for residential and non residential building at para medical college saifai etawah
Construction of remaining work for residential and non residential building at para medical college saifai etawah
Read moreSitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Read moreSurface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreof your Industry type