Tender Details

Particulars Details
Title
Construction Of Cwr (Capacity 300 Kl) And Laying Of Pipeline Work At Ward No 66, Auli Raipur, Dehradun
Description
Construction Of Cwr (Capacity 300 Kl) And Laying Of Pipeline Work At Ward No 66, Auli Raipur, Dehradun
Organisation CGM (Drinking Water) Jal Sansthan | State Govt. and UT
Tender Id 2024_UKJS_77401_3
Reference
Number
894/E-Tender/2024-25 dated 28-10-2024
Tender Fee 4720
EMD 4.16 Lakh
Tender Value
Place Dehradun
Link https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=92317
Start Date October 29, 2024 16:30
End Date

11/11/2024 ( Expired 195 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat

Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat

Read more
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Read more
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Read more
Dpr for construction of grade separators at sarona chowk (ch. 279.750) udyog bhawan (269.000) telibandha chowk (ch. 268.000) on raipur city portion of nh53 at raipur aurang section and ape(10.700) chowk of nh-30 raipur kodebad in chhattisgarh

Dpr for construction of grade separators at sarona chowk (ch. 279.750) udyog bhawan (269.000) telibandha chowk (ch. 268.000) on raipur city portion of nh53 at raipur aurang section and ape(10.700) chowk of nh-30 raipur kodebad in chhattisgarh

Read more
Construction of boundary wall and paver block work ganesh garden shyampur road ward no 22

Construction of boundary wall and paver block work ganesh garden shyampur road ward no 22

Read more
Construction of remaining work for residential and non residential building at para medical college saifai etawah

Construction of remaining work for residential and non residential building at para medical college saifai etawah

Read more
Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.

Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.

Read more
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu

Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise