Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Electrical Maintenance Of Lt(440 V) And Ht(3.3/33 Kv) Overhead Line And Sub Station Pre Monsoon For Kurja Ug Mine Of Kurja Sub Area.
|
| Description |
Electrical Maintenance Of Lt(440 V) And Ht(3.3/33 Kv) Overhead Line And Sub Station Pre Monsoon For Kurja Ug Mine Of Kurja Sub Area.
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_SECL_335563_1 |
|
Reference Number |
AGM/HSD/SO(EnM)/E-Tender/12, dt.19.05.2025 |
| Tender Fee | 0 |
| EMD | 8500 |
| Tender Value | - |
| Place | Hasdeo Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=347857 |
| Start Date | May 19, 2025 15:30 |
| End Date |
Expired
29/05/2025
Expired 505 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Diversion of ht 3.3 kv overhead line at khottadih ocp under pandaveswar area
Diversion of ht 3.3 kv overhead line at khottadih ocp under pandaveswar area
Read moreCustom bid for services - providing assistance for pre-monsoon preparation and monsoon management measures in mine-ii
Custom bid for services - providing assistance for pre-monsoon preparation and monsoon management measures in mine-ii
Read moreSupply, installation, testing andcommissioning of ngr 3.3 kv protection system in 33kv/3.3kv power transformers and 3.3kv dg set at 33kv s/s and ngr 440v protection system in 3.3kv/550v/440v power transformers at ncph, ra and vw ug mines of chrm ar
Supply, installation, testing andcommissioning of ngr 3.3 kv protection system in 33kv/3.3kv power transformers and 3.3kv dg set at 33kv s/s and ngr 440v protection system in 3.3kv/550v/440v power transformers at ncph, ra and vw ug mines of chrm ar
Read moreConstruction of 52 nos. pcc ventilation stoppings in 16ls,10ls,-16r and -9r panel of seam c at kurja ug mine.
Construction of 52 nos. pcc ventilation stoppings in 16ls,10ls,-16r and -9r panel of seam c at kurja ug mine.
Read moreRepair/renewal/replacement of ht overhead lines, ht ug and connected services under ge (a) suratgarh at suratgarh mil stn
Repair/renewal/replacement of ht overhead lines, ht ug and connected services under ge (a) suratgarh at suratgarh mil stn
Read morePreparation of belt roadway(8ln) and installation of 1000mm belt conveyor in main line of seam a at kurja ug mine of hasdeo area.
Preparation of belt roadway(8ln) and installation of 1000mm belt conveyor in main line of seam a at kurja ug mine of hasdeo area.
Read moreRepair/ maint of conversion of overhead lt/ht line to ug cable and related items at faridkot mil station
Repair/ maint of conversion of overhead lt/ht line to ug cable and related items at faridkot mil station
Read moreConstruction of 29 nos. of 50cm thick rcc isolation stopping to isolate 7ln,23ls(ii) and main dip proposed lhcm panel in seam a at kurja ug mine of hasdeo area.
Construction of 29 nos. of 50cm thick rcc isolation stopping to isolate 7ln,23ls(ii) and main dip proposed lhcm panel in seam a at kurja ug mine of hasdeo area.
Read moreWhite washing and stone dusting along belt roadway, travelling roadways and return roadway from incline mouth to proposed depillaring panels 16ls,10ls, -16r and -9r in seam c of kurja ug mine, hasdeo area.
White washing and stone dusting along belt roadway, travelling roadways and return roadway from incline mouth to proposed depillaring panels 16ls,10ls, -16r and -9r in seam c of kurja ug mine, hasdeo area.
Read moreAnnual maintenance of different 11 kv ht incoming and differernt 3.3 kv ht outgoing overhead power lines of jocp for a period of 12 months alongwith the renovation of lightning protection system of main substation, laiyo substation and mines at
Annual maintenance of different 11 kv ht incoming and differernt 3.3 kv ht outgoing overhead power lines of jocp for a period of 12 months along with the renovation of lightning protection system of main substation, laiyo substation and mines at
Read moreof your Industry type