Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Works Related To Labour Outsourcing City Division Kapurthala
|
Description |
Various Works Such As Releasing Of T/Well&Amp#X0d
Connections, Gsc/Isc Connections, De Loading Of&Amp#X0d
Overloaded T/Fs, Shifting Of Meters Outside Consumer&Amp#X0d
Premises, Earthing Of D Ts/Lines Or Any Development&Amp#X0d
Works Under Division City Kapurthala
|
Organisation | Department of Power | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 7080 |
EMD | 1.73 Lakh |
Tender Value | |
Place | Dy. Chief Engineer Circle Kapurthala |
Link |
AAAAAAAAAA Login to view |
Start Date | July 03, 2025 21:30 |
End Date |
01/08/2025 ( 27 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Provn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor
Provn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor
Read moreInvitation of bids to develop vasco city to goa international airport (dabolim) petroleum and petroleum products (atf) pipeline
Grant of authorization for laying, building, operating or expanding petroleum and petroleum product (atf) pipeline from vasco city to goa international airport (dabolim)
Read moreSitc for modification/ shifting of works of 11 kv and lt electrical utilities of brpl and dismantling/relocation of high mast and street lights of pwd and other agencies infringing lajpat nagar to saket g block corridor line 11.
Sitc for modification/ shifting of works of 11 kv and lt electrical utilities of brpl and dismantling/relocation of high mast and street lights of pwd and other agencies infringing lajpat nagar to saket g block corridor line 11.
Read moreBalance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Read moreRepair maint to boulder pitching, retaining wall, culverts, area drain, communiction cable ducts cover slabs and other allied works at launch complexes, tracking stations, site a, b, c, kumarpur, bhimpur, certain places from op4000 to op19000
Repair maint to boulder pitching, retaining wall, culverts, area drain, communiction cable ducts cover slabs and other allied works
 at launch complexes, tracking stations, site a, b, c, kumarpur, bhimpur,
 certain places from op4000 to op19000
Read moreDoor to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Read moreConst. of 4lane elevated corridor including approaches from old pune naka to boramani naka on nh65 in solapur city on ham in maharashtra (km 0.050 to km 9.710)
Const. of 4lane elevated corridor including approaches from old pune naka to boramani naka on nh65 in solapur city on ham in maharashtra (km 0.050 to km 9.710)
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreRehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).
Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).
Read moreAAAAAAAAAA
Login to viewSupplying and laying of 600 mm diameter ms rising main from&#x0d shiksha bhawan kolkata ground to kasba clean city (j-5 to j-6)
Read moreof your Industry type