Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 12 (Twelve) Nos. 0.50 M Thick Sectionalisation Stoppings At Rviia Seam, No. 8 Pit Of Bankola Colliery
|
| Description |
Construction Of 12 (Twelve) Nos. 0.50 M Thick Sectionalisation Stoppings At Rviia Seam, No. 8 Pit Of Bankola Colliery
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_ECL_286178_1 |
|
Reference Number |
ECL/GM/BA/E TENDER/23-24/Min/93 Dt 14.08.2023 |
| Tender Fee | |
| EMD | 21300 |
| Tender Value | |
| Place | Online |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | August 16, 2023 15:30 |
| End Date |
Expired
30/08/2023
Expired 1031 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing of vct boiler no. wbl-6035 at madhaipur colliery under pandaveswar area and repairing of boiler injector and steam pipeline 9, 1, 5 and 6 pit of madhaipur colliery
Repairing of vct boiler no. wbl-6035 at madhaipur colliery under pandaveswar area and repairing of boiler injector and steam pipeline 9, 1, 5 and 6 pit of madhaipur colliery
Read moreDrilling of 10 nos of boreholes with casing (non-coring )150 mm diameter with lowering and casing of pipes from surface to xiii/xiv seam is urgently required at kenduiadh colliery under p.b area
Drilling of 10 nos of boreholes
 with casing (non-coring )150
 mm diameter with lowering and
 casing of pipes from surface to
 xiii/xiv seam is urgently
 required at kenduiadh colliery
 under p.b area
Read moreFabrication and repairing of 150 hp direct haulage for smooth and safe haulage operation at pit no. 09 in madhaipur colliery under pandaveswar area.
Fabrication and repairing of 150 hp direct haulage for smooth and safe haulage operation at pit no. 09 in madhaipur colliery under pandaveswar area.
Read moreConstruction of 16 (sixteen) nos 0.50m thick sectionalisation isolation stoppings around proposed stowing panel rvii s7 at bankola (rvii) seam, sankalpa khani of bankola colliery
Construction of 16 (sixteen) nos 0.50m thick sectionalisation isolation stoppings around proposed stowing panel rvii s7 at bankola (rvii) seam, sankalpa khani of bankola colliery
Read moreConstruction of 5 (five) nos 0.50m thick isolation stopping at rvii seam no 8 pit of bankola colliery.
Construction of 5 (five) nos 0.50m thick isolation stopping at rvii seam no 8 
 pit of bankola colliery.
Read moreRepairing of 12 (twelve) nos sectionalisation in rvii seam of sankalpa khani of bankola colliery.
Repairing of 12 (twelve) nos sectionalisation in rvii seam of sankalpa khani of bankola colliery.
Read moreConstruction of 6(six) nos 0.50m thick sectionalisation stopping at rviiit and rviiib seam near jc caving panel no 1 incline of bankola colliery
Construction of 6(six) nos 0.50m thick sectionalisation stopping at rviiit and rviiib seam near jc caving panel no 1 incline of bankola colliery
Read moreConstruction of 6(six) nos 1.0 ntx1.0 mt thick brick pillars at rviia rvii seam of no.8 pit of bankola colliery.
Construction of 6(six) nos 1.0 ntx1.0 mt thick brick pillars at rviia rvii seam of no.8 pit of bankola colliery.
Read moreRemaining 06 nos. of 0.50 m thick isolation stoppings around stowing panel rvii 1a at rvii seam of no. 8 pit at bankola colliery.
Remaining 06 nos. of 0.50 m thick isolation stoppings around stowing panel
 rvii 1a at rvii seam of no. 8 pit at bankola colliery.
Read moreRepairing of 10 ten nos. ventilation stopping in rviia and rvii seam of no 8 pit of bankola colliery.
Repairing of 10 ten nos. ventilation stopping in rviia and rvii seam of no 8 pit of bankola colliery.
Read moreof your Industry type