Tender Details

Particulars Details
Title
Custom Bid For Services Carrying Out Pipeline Health Integrity Survey Of Bcpls All Cross Country
Description
Organisation Brahmaputra Cracker and Polymer Limited | Ministry of Petroleum and Natural Gas
Tender Id GEM/2024/B/5547714
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date October 25, 2024 22:01
End Date
Expired 13/11/2024

Expired 696 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: Lakhs Experience with Gov. Required: Years Project Experience Required: No
Buyer Name: Amit Prasad
Ministry: Ministry Of Petroleum And Natural Gas
Department: Brahmaputra Cracker And Polymer Limited
Organisation: Brahmaputra Cracker And Polymer Limited
Similar Tenders
Quotation rate for non sr item for installation of motors diesel general servicing and carrying out other necessary works in wet wells under vijayapura city corporation limits.

Quotation rate for non sr item for installation of motors diesel general servicing and carrying out other necessary works in wet wells under vijayapura city corporation limits.

Read more
Conducting detailed survey including preliminary investigation, net level survey, taking longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and estimates of distributory network including minors or sub-minors or field channels by conducting detailed block level survey for an extent 35,220 acres to identify a minimum net ayacut of 29,937 acres by proposing a ph at pragallapalli village, dummugudem mandal of bhadradri

Conducting detailed survey including preliminary investigation, net level survey, taking longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and estimates of distributory network including minors or sub-minors or field channels by conducting detailed block level survey for an extent 35,220 acres to identify a minimum net ayacut of 29,937 acres by proposing a ph at pragallapalli village, dummugudem mandal of bhadradri kothagudem district on left bank of sitamma sagar multi purpose project.(2nd call)

Read more
Carrying out certain electrical works, networking , providing of air conditioners units, providing 7.5kva ups ,providing epabx system in the quarter no 10,minister quarters,road no 12 banjarahills, hyderabad. part c:providing epabx system

Carrying out certain electrical works, networking , providing of air conditioners units, providing 7.5kva ups ,providing epabx system in the quarter no 10,minister quarters,road no 12 banjarahills, hyderabad. part c:providing epabx system

Read more
Carrying out certain electrical works, networking , providing of air conditioners units, providing 7.5kva ups ,providing epabx system in the quarter no 10,minister quarters,road no 12 banjarahills, hyderabad. part d:providing 7.5 kva ups

Carrying out certain electrical works, networking , providing of air conditioners units, providing 7.5kva ups ,providing epabx system in the quarter no 10,minister quarters,road no 12 banjarahills, hyderabad. part d:providing 7.5 kva ups

Read more
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.

Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.

Read more
Carrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27

Carrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27

Read more
Procurement of chemicals are essential for carrying out anti-larval operations and vector control measures in ghatkesar circle-06 to prevent the outbreak of mosquito-borne diseases. timely procurement is necessary to ensure uninterrupted entomology activities, ghatkesar circle-06, mmc

Procurement of chemicals are essential for carrying out anti-larval operations and vector control measures in ghatkesar circle-06 to prevent the outbreak of mosquito-borne diseases. timely procurement is necessary to ensure uninterrupted entomology activities, ghatkesar circle-06, mmc

Read more
Carrying out repairs for strengthening, sandblasting and painting with anti-corrosive coating for intake service gates of unit # 5 (two gates) and painting of stop log gates (22 elements) and lifting beam of mono rail hoist available at intake gates of pjhes with anti-corrosive paint

Carrying out repairs for strengthening, sandblasting and painting with anti-corrosive coating for intake service gates of unit # 5 (two gates) and painting of stop log gates (22 elements) and lifting beam of mono rail hoist available at intake gates of pjhes with anti-corrosive paint

Read more
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).

Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise