Tender Details
Particulars | Details |
---|---|
Title |
Augmentation Of 2 Nos 33 Kv Feeder From Salt Lake Ais 132 Kv Sub Station To Src Sub Station
|
Description |
Augmentation Of 2 Nos 33 Kv Feeder By Laying Of 33 Kv Grade 3 Single Core 1000 Sq Mm Al Xlpe Cable Replacing Single 3 Core 400 Sq Mm Xlpe Cable From Salt Lake Ais 132 Kv Sub Station To Src 33/11 Kv Sub Station (Route Length 500 M) Under Bnd I
|
Organisation | WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD | State Govt. and UT |
Tender Id | 2025_WBSED_804587_1 |
Reference Number |
BNDD-I/E-Tender/2024-2025/1699 |
Tender Fee | 0 |
EMD | 38989 |
Tender Value | |
Place | AIS 132KV Sub-Stn to SRC 33/11 KV Sub-Stn |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1787362 |
Start Date | January 27, 2025 21:30 |
End Date |
10/02/2025 ( Expired 115 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Appointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreTower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line
Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh (5 gw leh-kaithal transmission corridor)
Read moreTower package tw03 for zing-zingbar to sissu portion of 350 kv hvdc pang-kaithal transmission line
Tower package tw03 for i zingzingbar to sissu portion of 350 kv hvdc pangkaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh 5 gw lehkaithal transmission corridor under rtm route
Read moreSurface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 132 kv harda-seoni malwa and 132 kv itarsi-seoni malwa line under tlm sub dn. harda under ee (eht-maint.) dn itarsi.
Surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 132 kv harda-seoni malwa and 132 kv itarsi-seoni malwa line under tlm sub dn. harda under ee (eht-maint.) dn itarsi.
Read moreConst. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Const. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Read moreWidening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreIe services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Read moreUpgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Read moreW.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
Read moreof your Industry type