Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Development Of Road From Porkhalong To Twisaharpek L 1.10 Km During The Year 2024 25 Gsb Wbm Pucca Drain Protection Work Etc. 2nd Call
|
Description |
Works
|
Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 4000 |
EMD | 2.9 Lakh |
Tender Value | |
Place | Khowai |
Link |
AAAAAAAAAA Login to view |
Start Date | July 05, 2025 15:30 |
End Date |
15/07/2025 ( 14 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.
Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.
Read moreAppointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreUpgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)
Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)
Read moreAAAAAAAAAA
Login to viewLeft out portion of old nh32 at balarampur market road, improvement of drainage system by constructing surface drain from 3.050 km to 3.175 km under purulia highway division in the district of purulia. (ch. to deposit work)
Read moreFzk 25-026
Sr of v/lr compaction of earth work to&#x0d pc including fixig of road structure road safety measure,&#x0d const of culvert/drain etc. including 5 years maint in m.c &#x0d abohar asseb consti abh and balluana disttt. fzk wc 25 026 gno.07&#x0d
Read morePbmc work in km 115.000 to 141.050 of nh-333 for the year 2024-25
Pbmc work in km 115.000 to 141.050 of nh-333 for the year 2024-25
Read moreRepair of various rural link roads in mc nurmahal (compaction of earth work to 20 mm thick open graded pc with seal coat and construction of culverts,side drain and road structures) with 5 year maintenance under nabard loan/mc/mb fund distt jalandhar
Repair of various rural link roads in mc nurmahal (compaction of earth work to 20 mm thick open graded pc with seal coat and construction of culverts,side drain and road structure) with 5 year maintenance under nabard loan/mc/mb funds distt jalandhar
Read moreSpecial repair of link roads under special repair programme year 2022-23 2023-24 and 2024-25 from earth work upto premix carpet and road furniture safety measures with 5 year maintenance mc batala, fatehgarh churian and dera baba nanak group no-1
Special repair of link roads under special repair programme year 2022-23 2023-24 and 2024-25 from earth work upto premix carpet and road furniture safety measures with 5 year maintenance mc batala, fatehgarh churian and dera baba nanak group no-1
Read moreAAAAAAAAAA
Login to viewStrengthening of wearing surface of road by providing mastic asphalt including allied works along road from sonada to moonda (0.00-1.00km), sonada.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreof your Industry type