Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Excavation And Construction Of Remaining Portion Of Waste Weir Of Panhalghar M.I. Scheme.
|
| Description |
Excavation And Construction Of Remaining Portion Of Waste Weir Of Panhalghar M.I. Scheme.
|
| Organisation | CE-Water Resources Dept. Konkan Region Mumbai | State Govt. and UT |
| Tender Id | 2024_CWRDK_1087253_2 |
|
Reference Number |
E TENDER NOTICE NO 02 OF 2024-2025 |
| Tender Fee | 2860 |
| EMD | 43000 |
| Tender Value | - |
| Place | MANGAON |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1897548 |
| Start Date | September 19, 2024 16:30 |
| End Date |
Expired
26/09/2024
Expired 747 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Remaining portion of noorkhah to reshawari bridge balance length
Remaining portion of noorkhah to reshawari bridge balance length
Read moreConstruction of remaining portion of boundary wall and maintenance work of fiac extension, biridi, jagatsinghpur
Construction of boundary wall and other maintenance work
Read moreConstruction of ogee fall of waste weir of indira gandhi tank.(special repair)
Construction of ogee fall of waste weir of indira gandhi tank.(special repair)
Read moreBlock umarda- pc repair work (restoration) on remaining portion of indragarh majhila road vai khempurwa sahiyapur road by hotmix method.
Civil work
Read moreRepair and maintenance work of non dlp portion of road bari baseri bayana weir bhusawar chonkarwara kherli road (sh 43,45 and 22)
Repair and maintenance work of non dlp portion of road bari baseri bayana weir bhusawar chonkarwara kherli road (sh 43,45 and 22)
Read moreEstimate for the construction of precast boundary wall at remaining portion of dumping ground, hoshiarpur (reso no. 736 (7) datred 25.03.2026)
Estimate for the construction of precast boundary wall at remaining portion of dumping ground, hoshiarpur (reso no. 736 (7) datred 25.03.2026)
Read more2-2. gram panchayat lodhwar surfacing layer maintenance and construction work on the remaining portion of the link road from lodhwara to kadikheda bhitakheda
2. gram panchayat lodhwar surfacing layer maintenance and construction work on the remaining portion of the link road from lodhwara to kadikheda bhitakheda
Read more3d wall art painting work( graffiti art work) at various location in mc jhajjar (remaining portion of badli road flyover side wall, parks wall, govt. buildingsand and other suitable locations of mc limit) (re-call)
3d wall art painting work( graffiti art work) at various location in mc jhajjar (remaining portion of badli road flyover side wall, parks wall, govt. buildingsand and other suitable locations of mc limit) (re-call)
Read moreConstruction of pending remaining portion of bund / p wall nr. h/o ab. hamid bhat and others at wanigam payeen eid ghah coloney year - 2026 - 27 pyt - wanigam payeen a block - pattan under - cdf hble mla
Construction of pending remaining portion of bund / p wall nr. h/o ab. hamid bhat and others at wanigam payeen eid ghah coloney year - 2026 - 27 pyt - wanigam payeen a block - pattan under - cdf hble mla
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreof your Industry type