Tender Details

Particulars Details
Title
Excavation And Construction Of Remaining Portion Of Waste Weir Of Panhalghar M.I. Scheme.
Description
Excavation And Construction Of Remaining Portion Of Waste Weir Of Panhalghar M.I. Scheme.
Organisation CE-Water Resources Dept. Konkan Region Mumbai | State Govt. and UT
Tender Id 2024_CWRDK_1087253_2
Reference
Number
E TENDER NOTICE NO 02 OF 2024-2025
Tender Fee 2860
EMD 43000
Tender Value -
Place MANGAON
Link
View Original Tender Notice

https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1897548

Start Date September 19, 2024 16:30
End Date
Expired 26/09/2024

Expired 747 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Remaining portion of noorkhah to reshawari bridge balance length

Remaining portion of noorkhah to reshawari bridge balance length

Read more
Construction of ogee fall of waste weir of indira gandhi tank.(special repair)

Construction of ogee fall of waste weir of indira gandhi tank.(special repair)

Read more
Repair and maintenance work of non dlp portion of road bari baseri bayana weir bhusawar chonkarwara kherli road (sh 43,45 and 22)

Repair and maintenance work of non dlp portion of road bari baseri bayana weir bhusawar chonkarwara kherli road (sh 43,45 and 22)

Read more
Estimate for the construction of precast boundary wall at remaining portion of dumping ground, hoshiarpur (reso no. 736 (7) datred 25.03.2026)

Estimate for the construction of precast boundary wall at remaining portion of dumping ground, hoshiarpur (reso no. 736 (7) datred 25.03.2026)

Read more
2-2. gram panchayat lodhwar surfacing layer maintenance and construction work on the remaining portion of the link road from lodhwara to kadikheda bhitakheda

2. gram panchayat lodhwar surfacing layer maintenance and construction work on the remaining portion of the link road from lodhwara to kadikheda bhitakheda

Read more
3d wall art painting work( graffiti art work) at various location in mc jhajjar (remaining portion of badli road flyover side wall, parks wall, govt. buildingsand and other suitable locations of mc limit) (re-call)

3d wall art painting work( graffiti art work) at various location in mc jhajjar (remaining portion of badli road flyover side wall, parks wall, govt. buildingsand and other suitable locations of mc limit) (re-call)

Read more
Construction of pending remaining portion of bund / p wall nr. h/o ab. hamid bhat and others at wanigam payeen eid ghah coloney year - 2026 - 27 pyt - wanigam payeen a block - pattan under - cdf hble mla

Construction of pending remaining portion of bund / p wall nr. h/o ab. hamid bhat and others at wanigam payeen eid ghah coloney year - 2026 - 27 pyt - wanigam payeen a block - pattan under - cdf hble mla

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise