Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Erection, Dismantling, Diversion And Extension Of 6.6 Kv O/H Line Excv. 1075 And 1851 At Kathara Colliery
|
| Description |
Erection, Dismantling, Diversion And Extension Of 6.6 Kv O/H Line Excv. 1075 And 1851 At Kathara Colliery
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_290130_1 |
|
Reference Number |
KTC/PE(EnM)/E-Tender/23-24/139 |
| Tender Fee | - |
| EMD | 5600 |
| Tender Value | - |
| Place | Office of the Project Officer, PE (EnM), Kathara C |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | October 04, 2023 15:30 |
| End Date |
Expired
12/10/2023
Expired 1099 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Shifting, diversion, extension, dismantling, repairing and maintenance of 02(two) ranges of 10 inch and 8 inch dia. m.s. pipeline at quarry no.2 of kathara colliery.
Shifting, diversion, extension, dismantling, repairing and maintenance of 02(two) ranges of 10 inch and 8 inch dia. m.s. pipeline at quarry no.2 of kathara colliery.
Read moreFor dismantling of ocp substation shed of size 50 ft x 50 and dismantling shifting, loading unloading of 1.5mva,6.6kv/3.3kv, transformer of badeopur colliery under sijua area
For dismantling of ocp substation shed of size 50 ft x 50 and dismantling shifting, loading unloading of 1.5mva,6.6kv/3.3kv, transformer of badeopur colliery under sijua area
Read moreRepair and maintenance including diversion and extension of 3.3kv overhead line from 3mva/3.3kv transformer, jhirkey basti to jhirkey river side and harizan tola to safique gali transformer and mustaque gali under kathara colliery for the period of 0
Repair and maintenance including diversion and extension of 3.3kv overhead line from 3mva/3.3kv transformer, jhirkey basti to jhirkey river side and harizan tola to safique gali transformer and mustaque gali under kathara colliery for the period of 0
Read moreDismantling, shifting, re-erection, foundation, electrical cable shifting/extension, earthing, testing and commissioning of street light pole.
Dismantling, shifting, re-erection, foundation, electrical cable shifting/extension, earthing, testing and commissioning of street light pole.
Read more(a)day to day erection, extension, diversion and dismantling of 220v/440 v oh line at 06 no, departmental patch and weighbridge for providing lighting power for proper lighting for operation of shovel for a period of 365 days or till exhaustion of qu
(a)day to day erection, extension, diversion and dismantling of 220v/440 v oh line at 06 no, departmental patch and weighbridge for providing lighting power for proper lighting for operation of shovel for a period of 365 days or till exhaustion of qu
Read moreShifting/diversion and modification of electrical utilities and transmission line(s) of 11kv and above infringing the alignment,comprising dismantling of existing towers/poles,conductors and allied electrical installations,supply, erection,stringing,
(continue ) testing and commissioning of new towers/poles with allied foundation and other allied works etc. schedule-a- b/w aligarh jn.stn and harduaganj stn.schedule-b- shifting of ncr transmission line between aligarh jn.stn and daud khan stn
Read moreDismantling of 6 no. damaged pole and re-erection of 6 no. pole and erection 550 mtrs cradle guard in the 3 wire 550v overhead line from 5 pit sub-station to jeenagora weigh bridge of amal. joyrampur colliery under lodna area..
Dismantling of 6 no. damaged pole and re-erection of 6 no. pole and erection 550 mtrs cradle guard in the 3 wire 550v overhead line from 5 pit sub-station to jeenagora weigh bridge of amal. joyrampur colliery under lodna area..
Read moreDismantling, re-erection, and construction of 132 kv dc lilo of rongkhon ampati due to diversion of the 132 kv dc lilo of rongkhon ampati at the 132/33 kv praharinagar substation (between tower locations 8 and 12) (line length 1.85 ckm)
Dismantling, re-erection, and construction of 132 kv dc lilo of rongkhon ampati due to diversion of the 132 kv dc lilo of rongkhon ampati at the 132/33 kv praharinagar substation (between tower locations 8 and 12) (line length 1.85 ckm)
Read moreFor day to day erection, dismantling, diversion and extension of 6.6kv, o h line at open cast mines of kathara colliery.
For day to day erection, dismantling, diversion and extension of 6.6kv, o h line at open cast mines of kathara colliery.
Read moreReorganization extension of 6.6kv oh power line from excv. 1844 at quarry no. 2 (2.5 no.) to excv. 1851 and quarry no. 3 pump of kathara colliery
Reorganization extension of 6.6kv oh power line from excv. 1844 at quarry no. 2 (2.5 no.) to excv. 1851 and quarry no. 3 pump of kathara colliery
Read moreof your Industry type