Tender Details

Particulars Details
Title
Removal Of Grass Bushes Etc From Ndct 1 2 Surrounding Permanent Store I Ii Iii Area
Description
Removal Of Grass, Bushes Etc. From Ndct 1 And 2 Surrounding, Permanent Store I,Ii,Iii Area, Weigh Bridge No 4 And 5 Surrounding And Both Side Of Peripheral Patrol Road Area From Watch Tower No 1 To 6 At Dvc,Rtps
Organisation Damodar Valley Corporation | Public Sector Undertakings
Tender Id 2025_DVC_238725_1
Reference
Number
Tender RTPS Civil 00268
Tender Fee 0
EMD 0
Tender Value -
Place RAGHUNATHPUR THERMAL POWER STATION, RTPS, DVC
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=271320

Start Date June 18, 2025 19:30
End Date
Expired 04/07/2025

Expired 465 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Procurement of paints are required for painting of sign boards,sop,curb walls ,tyre cage,bay margins etc. at different section at base workshop oc-iii, rg2

Procurement of paints are required for painting of sign boards,sop,curb walls ,tyre cage,bay margins etc. at different section at base workshop oc-iii, rg2

Read more
Maintenance of entire external area, including horticulture, plantation, gardening, necessary pest control, grass area, parking areas, celebration ground, parade ground, pond, rain water harvesting system, drainage system, swimming pool, all open spaces and all rest areas (excluding buildings) etc. of bihar police academy, rajgir, nalanda (bihar) (for upcoming 5 years)

Maintenance of entire external area, including horticulture, plantation, gardening, necessary pest control, grass area, parking areas, celebration ground, parade ground, pond, rain water harvesting system, drainage system, swimming pool, all open spaces and all rest areas (excluding buildings) etc. of bihar police academy, rajgir, nalanda (bihar) (for upcoming 5 years)

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Removal of grass, bushes etc. from ndct-1 and 2 surrounding, permanent store-i,ii,iii area, weigh bridge no- 4 and 5 surrounding and both side of peripheral patrol road area from watch tower no- 1 to 6 at dvc,rtps

Removal of grass, bushes etc.&#x0d from ndct-1 and 2 surrounding, permanent store-i,ii,iii area, weigh bridge no- 4 and 5 surrounding and both side of&#x0d peripheral patrol road area from watch tower no- 1 to 6 at dvc,rtps

Read more
Maintaining grass free area by removal of grass shrubs bushes etc

Maintaining grass free area by removal of grass shrubs bushes etc at 400kv substation chhegaon

Read more
Maintaing grass free area by removal of grass shrubs and bushes etc

Work of maintaining grass free area by removal of grass shrubs and bushes etc at chhegaon 400kv substation

Read more
Removal of grass, bushes etc. from avgf area, guest house area, scrap yard

Removal of grass, bushes etc. from avgf area, guest house area, scrap yard, both side of road from&#x0d main gate complex to permanent store via material gate, both side of peripheral patrol road area from&#x0d watch tower no. 6 to 18 and other areas etc.

Read more
Clearing and uprooting of grass, bushes, shrubs etc. and silt clearance of drains of surrounding workshop area.

Clearing and uprooting of grass, bushes, shrubs etc. and silt clearance of drains of surrounding workshop area.

Read more
Cleaning and removal of grass and bushes, trimming of tree branches inside central store at cws tadali.

Cleaning and removal of grass and bushes, trimming of tree branches inside central store at cws tadali.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise