Tender Details

Particulars Details
Title
Wbphed/Ee/Bd I/24 25/Niet29 14
Description
Sinking Of 250mm X 150 Mm Dia Tube Well 120.00 Mtr. Deep By Direct Rotary Rig Method Using Upvc Pipe And Upvc Deep Well Screen (Rds) Filter At Paschimrampur Pwss (Tw Iii Site) Within Bhagwangola I Block Under Jal Jeevan Mission In Connection
Organisation PHE | State Govt. and UT
Tender Id 2025_PHED_830680_8
Reference
Number
WBPHED/EE/BD-I/NIeT-29of 2024 - 2025
Tender Fee 0
EMD 18019
Tender Value
Place O/o the EE,BD-I, 4C.R.Das Road,2nd Floor,MSD
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1849907
Start Date March 26, 2025 00:25
End Date

23/04/2025 ( Expired 55 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders

Sinking of 250 x 200 mm dia 150m deep tube well by d.r. rig method using upvc pipe cd and upvc deep well screen rds under central circle, phe dte.1 no at bolgona railway par replacement tw-iii under bolgona pwss

Read more
Sinking of 250 x 200 mm dia and 150 mtr deep tube well

Sinking of 250 x 200 mm dia and 150 mtr deep tube well with 200 mm pvc strainer including rising main and e-m works at ward no -17 within cooch behar municipal area

Read more
Name of work - drilling of combination well 350/150 mm dia and 60 mtr. deep gravel packed twand 150 mm dia 60 mtr ordinary t.w. (total 120 mtr depth) 60 nos. tubewells by combination rig under jal jeevan mission in various villages of block ghughri

Name of work - drilling of combination well 350/150 mm dia and 60 mtr. deep gravel packed twand 150 mm dia 60 mtr ordinary t.w. (total 120 mtr depth) 60 nos. tubewells by combination rig under jal jeevan mission in various villages of block ghughri

Read more
Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes

Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes

Read more
Wbphed/ae/hq/enit_02/25-26_7

Sinking of 300 mm x 200 mm dia tube well 150 mtr. depth by d.r. rig method using upvc pipe cm and upvc deep well screen rms for 5th tw site at keotara village of abujhati pwss

Read more
Sinking of 200 mm. dia deep tube well with top enlargement 300 mm. dia, depth of tube well is considered around 102 mtr with pvc pipe by direct rotary rig boring system within englishbazar municipality area, malda at ward no-18 on required location.

Sinking of 200 mm. dia deep tube well with top enlargement 300 mm. dia, depth of tube well is considered around 102 mtr with pvc pipe by direct rotary rig boring system within englishbazar municipality area, malda at ward no-18 on required location.

Read more
Sinking of 250 x 200 mm dia and 150 mtr deep tube well

Sinking of 250 x 200 mm dia and 150 mtr deep tube well with 200 mm pvc strainer including rising main and e-m works at ward no -17 within cooch behar municipal area

Read more
Wbphed/ee/bd-i/24-25/niet29_14

Sinking of 250mm x 150 mm dia tube well 120.00 mtr. deep by direct rotary rig method using upvc pipe and upvc deep well screen (rds) filter at paschimrampur pwss (tw - iii site) within bhagwangola-i block under jal jeevan mission in connection

Read more
Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes

Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes

Read more
Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district samba of samba province under jal jeevan mission

Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district samba of samba province under jal jeevan mission

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise