Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hammer Box Complete In Loose Components In Suitable Packing.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106236785 |
|
Reference Number |
03232078 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | DELHI |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/012024/106236785/viewNitPdf_4446987.pdf |
| Start Date | January 06, 2024 16:08 |
| End Date |
Expired
22/01/2024
Expired 1000 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Fabrication and supply of 900 ms body and loose components
Fabrication and supply of 900 ms body and loose components
Read moreSupply of hammer box complete and fixing in locomotives as per drg no. els/sre/01/2023-24
Supply of hammer box complete and fixing in locomotives as per drg no. els/sre/01/2023-24
Read moreHoneycomb packing box for b23 vi - 9p,honeycomb packing box for b28 vi - 12p
Honeycomb packing box for b23 vi - 9p,honeycomb packing box for b28 vi - 12p
Read moreTrough floor assembly complete for 3 phase memu/dmc coach note:- 1.0 extra channels are to be provided on suitable location of trough floor assembly for lifting/transporation purpose ., as per drawing: em11545 alt b item no. 6 to be supplied as loose in seprate packing, packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any sh
Trough floor assembly complete for 3 phase memu/dmc coach note:- 1.0 extra channels are to be provided on suitable location of trough floor assembly for lifting/transporation purpose ., as per drawing: em11545 alt b item no. 6 to be supplied as loose in seprate packing, packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any sh
Read moreBattery box assembly schedule of infrastructural requirements for stainless steel battery box complete as per specfication no: mdst 141 rev.01 , as per drawing: cc91205 alt a , packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any shall be at the cost of supplier.
Battery box assembly schedule of infrastructural requirements for stainless steel battery box complete as per specfication no: mdst 141 rev.01 , as per drawing: cc91205 alt a , packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any shall be at the cost of supplier.
Read moreof your Industry type