Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Installation Of 40 Kw On Grid / Hybrid Solar Power Plant In Govt. Industrial Training Institute (Women), Hisar Distt. Hisar
|
| Description |
Installation Of 40 Kw On Grid / Hybrid Solar Power Plant In Govt. Industrial Training Institute (Women), Hisar Distt. Hisar
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2024_HRY_381779_1 |
|
Reference Number |
202480C4DAB5 7288 47D0 AA03 80E0088C70A0666BAR |
| Tender Fee | 6180 |
| EMD | 62360 |
| Tender Value | |
| Place | Hisar |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=457807 |
| Start Date | June 24, 2024 15:30 |
| End Date |
Expired
08/07/2024
Expired 725 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, engineering, supply, installation and commissioning of 757 kwp / 742 kw or above capacity on-grid rooftop solar power plant on 11 identified buildings
Design, engineering, supply, installation and commissioning of 757 kwp / 742 kw or above capacity on-grid rooftop solar power plant on 11 identified buildings
Read moreSurvey, design, fabrication, supply, installation, testing and commissioning of total 21.00 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 3 years
Survey, design, fabrication, supply, installation, testing and commissioning of total 21.00 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 3 years
Read moreSurvey, design, fabrication, supply, installation, testing, commissioning with rms of 10 kw cap. of grid connected spv power plant with hybd inverter (4 hrs battery back-up) with 5 years cmc at govt.ashram school, korta ta. umerkhed, dist. yavatmal
Survey, design, fabrication, supply, installation, testing, commissioning with rms of 10 kw cap. of grid connected spv power plant with hybd inverter (4 hrs battery back-up) with 5 years cmc at govt.ashram school, korta ta. umerkhed, dist. yavatmal
Read moreInstallation of 40 kw on-grid / hybrid solar power plant in govt. industrial training institute (women), hisar distt. hisar (recall)
Installation of 40 kw on-grid / hybrid solar power plant in govt. industrial training institute (women), hisar distt. hisar (recall)
Read moreInstallation of 20 kw on grid/hybrid solar power plant with battery bank in govt. industrial training institute barwala, distt. hisar
Installation of 20 kw on grid/hybrid solar power plant with battery bank in govt. industrial training institute barwala, distt. hisar
Read moreInstallation of 20 kw on grid/hybrid solar power plant with battery bank in govt. industrial training institute barwala, distt. hisar (recall)
Installation of 20 kw on grid/hybrid solar power plant with battery bank in govt. industrial training institute barwala, distt. hisar (recall)
Read morePdg. and installation of 49kw on-grid hybrid solar power plant in govt. industrial training institute (women) distt. karnal.
Pdg. and installation of 49kw on-grid hybrid solar power plant in govt. industrial training institute (women) distt. karnal.
Read moreInstallation of hybrid solar power plant in govt. industrial training institute (iti) distt. kurukshetra.
Installation of hybrid solar power plant in govt. industrial training institute (iti) distt. kurukshetra.
Read moreInstallation of 120 kw solar power plant in govt. industrial training institute, bharanpur, distt. ambala.(recall)
Installation of 120 kw solar power plant in govt. industrial training institute, bharanpur, distt. ambala.(recall)
Read moreof your Industry type