Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Invitation For Bids: Construction Of Flooring For 49 L Substation 🏗️ Central Coalfields Limited, A Public Sector Undertaking, Is Seeking Bids From Experienced Contractors For The Construction Of Flooring At The 49 L Substation Located In The Lower Bachra Seam Under The Churi Underground (Ug) Project. 📅 Bid Submission Deadline: May 21, 2024, 5:00 Pm Earnest Money Deposit (Emd): Inr 41,000 Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Cost Estimates, And Project Timelines, In Accordance With The Project's Requirements And Specifications. Keywords: Construction, Flooring, Substation, Central Coalfields Limited, Public Sector Undertaking, Churi Ug Project, Tender, Bid Submission| Particulars | Details |
|---|---|
| Title |
Construction Of Flooring Of 49 L Substation In Lower Bachra Seam Under Churi Ug Project.
|
| Description |
Construction Of Flooring Of 49 L Substation In Lower Bachra Seam Under Churi Ug Project.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_307753_1 |
|
Reference Number |
NK/Survey/2024-25/eNIT/01 |
| Tender Fee | 0 |
| EMD | 4100 |
| Tender Value | - |
| Place | Churi Ug |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=318909 |
| Start Date | May 09, 2024 19:30 |
| End Date |
Expired
21/05/2024
Expired 877 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Constructing new 11 kv ug cable from vyttila substation to petta junction
Constructing new 11 kv ug cable from vyttila substation to petta junction
Read moreCross stitching at junction of depillaring panel-23 in kenda seam of jambad ug colliery
Cross stitching at junction of depillaring panel-23 in kenda seam of jambad ug colliery
Read moreMaintenance of belt conveyor for cm panel of 10b(top) seam at haldibari ug mine.
Maintenance of belt conveyor for cm panel of 10b(top) seam at haldibari ug mine.
Read moreConstruction of 37 nos. isolation stopping in g-iiib seam p-1 panel of bagdewa ug mine.
Construction of 37 nos. isolation stopping in g-iiib seam p-1 panel of bagdewa ug mine.
Read moreLaying3x300sqmm 11kv ug cable from nangiarkulangara substation to kavala dp under electrical section pallippad
Laying3x300sqmm 11kv ug cable from nangiarkulangara substation to kavala dp under electrical section pallippad
Read moreConstruction of new ug feeder from proposed pantheerankavu substation-pantheerankavu feederunder electrical section pantheerankavu
Construction of new ug feeder from proposed pantheerankavu substation-pantheerankavu feederunder electrical section pantheerankavu
Read moreRepairing of 6 inch dia delivery pipe range in 2 seam incline ug fabrication of 3 nos. 6 inchu type bend one no. t type bend and 2 nos. at short pieces at 2 seam ug under wmc, akwmc katras area
Repairing of 6 inch dia delivery pipe range in 2 seam incline ug fabrication of 3 nos. 6 inchu type bend one no. t type bend and 2 nos. at short pieces at 2 seam ug under wmc, akwmc katras area
Read moreConstruction of 50 nos. bricks ventilation stoppings in g-iii bottom seam at bagdewa ug mine, korba area.
Construction of 50 nos. bricks ventilation stoppings in g-iii bottom seam at bagdewa ug mine, korba area.
Read moreCleaning of intermediate -65l sump and -92l sump in 4a seam at jhiria ug mine of hasdeo area.
Cleaning of intermediate -65l sump and -92l sump in 4a seam at jhiria ug mine of hasdeo area.
Read moreDrivage of 1 no. underground vertical air shaft from seam-iii to seam-i to establish return airway system for vijay west ug mine at rani atari sub area
Drivage of 1 no. underground vertical air shaft from seam-iii to seam-i to establish return airway system for vijay west ug mine at rani atari sub area
Read moreof your Industry type