Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Comprehensive Bid Invitation For Infrastructure Project 🏭🛠️ The Ministry Of Railways, Central Government, Invites Bids For A Multifaceted Infrastructure Project Involving The Alteration Of Phase Working At Shri Singaji Thermal Power Project, Khandwa, And Associated Works For The Metro Bridge Pillar And Rob On Nh 374 B Between Mathela And Khandwa Railway Stations. 📅 Bid Submission Deadline: 24/05/2024, 3:00 Pm A Tender Fee Of Inr 2,43,900 Is Applicable As Emd. Interested Bidders Must Review The Complete Tender Document For Detailed Project Specifications, Scope, And Submission Guidelines. Keywords: Ministry Of Railways, Infrastructure Project, Power Plant, Railway Station, Metro Bridge, Rob, Road Construction, Nh 374 B, Tender, Bid Submission| Particulars | Details |
|---|---|
| Title |
Alteration Of Phase Working Of Shri Singaji Thermal Power Project At Khandwa, Shifting Of Signalling Gears In Connection With Metro Bridge Pillar In Rkmp Yard &Amp Rob Work 573 /16 20 Between Mathela &Amp Khandwa Railway Stations In Connection With 4 Laning Of Rudhi To Deshgaon Section Of Nh 374 B.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 74771344 |
|
Reference Number |
BPLNWKS2024-25SIG03 |
| Tender Fee | 0 |
| EMD | 2.44 Lakh |
| Tender Value | - |
| Place | Jabalpur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74771344/viewNitPdf_4547293.pdf |
| Start Date | May 01, 2024 00:08 |
| End Date |
Expired
24/05/2024
Expired 856 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Bhopal division :- ohe alteration work due to construction of rob at km 573/16-20 between mathela and khandwa railway stations in connection with 4 laning of rudhi to deshgaon section of nh-347b. (electrical trd work)
For complete deion and other details, please refer to tender
Read moreBhopal division :- (a) ohe alteration work due to construction of proposed 2 lane bow string girder type rob to connect chhola & coach factory road via nishatpura yard between bhopal station-nishatpura yard. ( electrical trd work) (b) ohe alteration work due to construction of rob at km 573/16-20 between mathela and khandwa railway stations in connection with 4 laning of rudhi to deshgaon section of nh-347b. (electrical trd work)
For complete deion and other details, please refer to tender
Read moreExcavation, loading of pond ash from ash dyke of sstpp dongalia and transportation and unloading at designated places on the const. site of 4 lanning of khandwa bypass from rudhi to deshgaon (km 149 000 to km 177 680) section of sh-71/n- 347b/nh-753
Excavation, loading of pond ash from ash dyke of sstpp dongalia and transportation and unloading at designated places on the const. site of 4 lanning of khandwa bypass from rudhi to deshgaon (km 149 000 to km 177 680) section of sh-71/n- 347b/nh-753
Read moreSupply, installation, testing and commissioning of telecom material in connection with ratlam division: ratlam-khandwa section: (i) providing subway(rub) to eliminate manned level crossings no. 197, 227,230,233 & 234(05 nos.) (ii) providing subway(rub) to eliminate manned level crossings no. 275,277 & 278. (iii) providing subway(rub) to eliminate manned level crossings no. 237,240, 298 & lc no. 01 & 02 of rau-dhd section(05 nos.)
For complete deion and other details, please refer to tender
Read more(a) bhusaval-badnera section- design, supply, erection testing and commissioning of 25kv, single phase, ac ohe works, in connection with construction of 06 nos. new subways. (b) bhusaval-badnera & bhusaval-khandwa section- provision of earthing and bonding to safety fencing along the track.
For complete deion and other details, please refer to tender
Read moreSupply installation testing and commissioning of signalling material in connection with:- 1)- meghnagar-ratlam division-rebuilding of bridge no. 208 up/dn by rcc box bridge. 2)- ratlam-khandwa section-rebuilding of existing bridge no. 539a& 539b by rcc. box. 3)- ratlam-nagda section:--rebuilding br. no.310 up/dn a
For complete deion and other details, please refer to tender
Read moreof your Industry type