Tender Details

Particulars Details
Title
Removal Of Boulders From The Intake Tunnel Of 2x11.25 Mw Ganvi Power House Stage I
Description
Removal Of Boulders From The Intake Tunnel Of 2x11.25 Mw Ganvi Power House Stage I
Organisation HPSEBL | State Govt. and UT
Tender Id 2025_HPSEB_108932_1
Reference
Number
HPSEBL/GPHD/DB-9/2025-26-41
Tender Fee 590
EMD 1555
Tender Value -
Place Jeori
Link
View Original Tender Notice

https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=159149

Start Date June 28, 2025 22:30
End Date
Expired 04/07/2025

Expired 469 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Removal of boulders and leveling work in technical area

Removal of boulders and leveling work in technical area

Read more
Type a product removal port for block 109,type b product removal port on tunnel of block 111,type c product removal port over cell c01 of block 111,type d product removal port over cell c01 and c02 of block 113,type e product removal port on tunnel t02 of block 113,type f cask loading platform on tunnel t04 and t05 of block 113

Type a product removal port for block 109,type b product removal port on tunnel of block 111,type c product removal port over cell c01 of block 111,type d product removal port over cell c01 and c02 of block 113,type e product removal port on tunnel t02 of block 113,type f cask loading platform on tunnel t04 and t05 of block 113

Read more
Construction of civil works of barrage and stilling basin, u/s plastic cutoff trench, power intake structures, tunnel, outfall structure, associated hm works including adit plug, etc and associated works of link-3 project in himachal pradesh

Construction of civil works of barrage and stilling basin, u/s plastic cutoff trench, power intake structures, tunnel, outfall structure, associated hm works including adit plug, etc and associated works of link-3 project in himachal pradesh

Read more
Nctps i operation circle ca dn cwph unit iii overhauling of air release valves and their isolation valves in cwp discharge line of unit iii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun

Nctps i operation circle ca dn cwph unit iii overhauling of air release valves and their isolation valves in cwp discharge line of unit iii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun

Read more
Nctps i operation circle ca dn cwph unit ii overhauling of air release valves and their isolation valves in cwp discharge line of unit ii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun

Nctps i operation circle ca dn cwph unit ii overhauling of air release valves and their isolation valves in cwp discharge line of unit ii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any

Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any

Read more
Removal of silt from forebay tunnel of 2x11.25mw ganvi power house stage-i

Removal of silt from forebay tunnel of 2x11.25mw ganvi power house stage-i

Read more
Providing and fixing relays for panels of 2x11.25mw ganvi power house stage i under ganvi power house division, hpsebl, jeori.

Providing and fixing relays for panels of 2x11.25mw ganvi power house stage i under ganvi power house division, hpsebl, jeori.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise