Tender Details
Particulars | Details |
---|---|
Title |
Removal And Fitment Of H Frame Assembly With Mounting Base Repair, Undercarriage Repair And Cutting Of Tooth Point Adapter 06 Nos, And Fitting Of New Adopter 06 Nos. By Gauzing And Welding Of Ck 300 E Shovel Sl.No.E 164 Of Gidi C Colliery.
|
Description |
Removal And Fitment Of H Frame Assembly With Mounting Base Repair, Undercarriage Repair And Cutting Of Tooth Point Adapter 06 Nos, And Fitting Of New Adopter 06 Nos. By Gauzing And Welding Of Ck 300 E Shovel Sl.No.E 164 Of Gidi C Colliery.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_318168_1 |
Reference Number |
SO(X)(A)/e-NIT/33/24-25/98 |
Tender Fee | 0 |
EMD | 5800 |
Tender Value | |
Place | Gidi-C |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=329791 |
Start Date | September 25, 2024 23:30 |
End Date |
05/10/2024 ( Expired 198 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Removal of worn out under carriage assembly, repairing of damaged groove of track and carrier roller mounting in track frame and other track frame areas, assembly and fitment of under carriage assy in 8 nos. of bd355a3 dozer over a period of one year
Removal of worn out under carriage assembly, repairing of damaged groove of track and carrier roller mounting in track frame and other track frame areas, assembly and fitment of under carriage assy in 8 nos. of bd355a3 dozer over a period of one year
Read moreRepairing of a frame, housing, bush making and fitting, removal of broken stud, repairing of front brake rhs and front suspension support, repair of rear suspension both side and bush fitment of dumper d 1304 of kdh project, nk area.
Repairing of a frame, housing, bush making and fitting, removal of broken stud, repairing of front brake rhs and front suspension support, repair of rear suspension both side and bush fitment of dumper d 1304 of kdh project, nk area.
Read moreRepairing and removal of 12 nos. broken bolts of swing ,ring gear of ck-300 shovel -790 by jacking up the turret (upper frame) with hyd. jacks
Repairing and removal of 12 nos. broken bolts of swing ,ring gear of ck-300 shovel -790 by jacking up the turret (upper frame) with hyd. jacks
Read more1.repairing of cracked track frame under carriage and sprocket hole t-13642. 2.repair/ welding of cracked brace arm mounting pin 02 nos, rep of rh trunnion cover, its mounting bracket, cutting of broken bolt in t-13642.3.rep t-13642 4.t-13602
1.repairing of cracked track frame under carriage and sprocket hole t-13642. 2.repair/ welding of cracked brace arm mounting pin 02 nos, rep of rh trunnion cover, its mounting bracket, cutting of broken bolt in t-13642.3.rep t-13642 4.t-13602
Read moreRepairing of payloader boom frame housing of left and right side lift cylinder, by opening,fitting,hole reairing,pin repairing, yoke repairing,repairing of mudguard, step support ladder and 02 nos. adopter, tooth point fitment of p/l-284
Repairing of payloader boom frame housing of left and right side lift cylinder, by opening,fitting,hole reairing,pin repairing, yoke repairing,repairing of mudguard, step support ladder and 02 nos. adopter, tooth point fitment of p/l-284
Read more1.rep/rewinding of 3 phase 650 amp. welding 2. rep of electric turning joint and bottom guard rep of cracked mounting frame of slew ring of l and t ck300 shovel sl. no. 168. 3.rep of swing motor (l.h.s and r.h.s.) fitment of pinion of ekg 5a shovel-5
1.rep/rewinding of 3 phase 650 amp. welding 2. rep of electric turning joint and bottom guard rep of cracked mounting frame of slew ring of l and t ck300 shovel sl. no. 168. 3.rep of swing motor (l.h.s and r.h.s.) fitment of pinion of ekg 5a shovel-5
Read moreRepairing or welding of tooth-point adopter assembly-05nos, fitment of adopter set-05nos in bucket by gauging and welding and repairing of bucket by welding of plates of tata-1900 hydraulic shovel at kakri project.
Repairing or welding of tooth-point adopter assembly-05nos, fitment of adopter set-05nos in bucket by gauging and welding and repairing of bucket by welding of plates of tata-1900 hydraulic shovel at kakri project.
Read moreRepairing of 08 nos. failed track chain pad cutting and serviceable chain pad fitting and fabrication of base plate and platform p.t.o main prop. shaft pulley broken bolts removal and tapping in recp drill sl. no. 817 at bansdeopur ocp, sijua area
Repairing of 08 nos. failed track chain pad cutting and serviceable
 chain pad fitting and fabrication of base plate and platform p.t.o main prop. shaft pulley
 broken bolts removal and tapping in recp drill sl. no. 817 at bansdeopur ocp, sijua area
Read moreRepairing of boom placing mounting bracket (both side), boom housing bush pressing, denting of operator cabin, fitment of glasses in operator cabin of l and t ck 300 (sl. no. 757/2946) shovel of jarangdih colliery
Repairing of boom placing mounting bracket (both side), boom housing bush pressing, denting of operator cabin, fitment of glasses in operator cabin of l and t ck 300 (sl. no. 757/2946) shovel of jarangdih colliery
Read more03 nos. worn out and seized adapter tooth point changing with serviceable ones of be-1000 hyd. shovel sl. no. g10121 at bansdeopur ocp, sijua area.
03 nos. worn out and seized adapter tooth point changing with
 serviceable ones of be-1000 hyd. shovel sl. no. g10121 at bansdeopur ocp, sijua area.
Read moreof your Industry type