Checking/Testing Of Co2 Fire Suppression System Of Power House Of Uri Power Station
|
| Description |
|
| Organisation | NA | Ministry of Power |
| Tender Id | GEM/2024/B/4430212 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | January 03, 2024 21:49 |
| End Date |
Expired
24/01/2024
Expired 977 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreDesign, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Design, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Read moreDesign, engineering, supply, installation and commissioning of co2 gas fire suppression system
Design, engineering, supply, installation and commissioning of co2 gas fire suppression system along with common addressable fire detection and alarm system for hydro generators-1 and 2 of 2x50 mw hydro turbines of karbi langpi hydro electric project
Read moreof your Industry type