Work Of Construction And Commissioning 200 Mm Dia.Tube Well With Defect Liability Of 2 Years In Village Dhani Raikan Block Nohar Under Sub Div Pandusar
|
Description |
Work Of Construction And Commissioning 200 Mm Dia.Tube Well With Defect Liability Of 2 Years In Village Dhani Raikan Block Nohar Under Sub Div Pandusar
|
Organisation | PHED-Chief Engineer(HQ),Jaipur | State Govt. and UT |
Tender Id | 2025_PHCJA_473051_1 |
Reference Number |
NIT 13-15/2025-26/KARMSANA |
Tender Fee | 1000 |
EMD | 25240 |
Tender Value | |
Place | EE PHED KARMSANA |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=846311 |
Start Date | May 26, 2025 14:30 |
End Date |
03/06/2025 ( Expired 3 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Read moreImplementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreSupply, delivery, fandi, dismantling, installation and commissioning of control and relay panel and its associated cables as per ts for upgradation of powergrid feeders that has served more than 25 years feeders at other sebs - nerts under add cap 2024-29 block
Supply, delivery, fandi, dismantling, installation and commissioning of control and relay panel and its associated cables as per ts for upgradation of powergrid feeders that has served more than 25 years feeders at other sebs - nerts under add cap 2024-29 block
Read moreW.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.