Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Mtps I Bm Unit Ii Boiler Pressure Parts Coh 2024 Supply And Installation Of Air Sealants In Penthouse To Avoid Ash Leakage Air Ingression To The Boiler And Allied Works
|
Description |
Mtps I Bm Unit Ii Boiler Pressure Parts Coh 2024 Supply And Installation Of Air Sealants In Penthouse To Avoid Ash Leakage Air Ingression To The Boiler And Allied Works
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_499499_1 |
Reference Number |
CE / MTPS-I / SE / M-I / BM /OT.247 / 2024-25 |
Tender Fee | 0 |
EMD | 31300 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=593696 |
Start Date | November 07, 2024 21:30 |
End Date |
13/11/2024 ( Expired 226 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i bm unit i to iv boiler pressure parts safety valve floating during aoh 2025
Mtps i bm unit i to iv boiler pressure parts safety valve floating during aoh 2025
Read moreMtps i bm rotating parts units i and ii load testing and certification of movable trolleys chain blocks located above primary air fan forced draft fan aph induced draft fan and esp area
Mtps i bm rotating parts units i and ii load testing and certification of movable trolleys chain blocks located above primary air fan forced draft fan aph induced draft fan and esp area
Read moreMtps i bm unit i removal of deteriorated and dislodged insulation and re insulation with new insulation materials on the top and bottom portion of fg duct from mill bay outlet to esp inlet and other related works
Mtps i bm unit i removal of deteriorated and dislodged insulation and re insulation with new insulation materials on the top and bottom portion of fg duct from mill bay outlet to esp inlet and other related works
Read moreTtps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash
Ttps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash
Read moreMtps i mill plant ac plant ac cooling tower stage i ii sump tank overflow water drain line laying rerouting to bottom ash hopper unit i trench for zero discharge of a zone area and providing an accessories of water level indicator for sump tanks
Mtps i mill plant ac plant ac cooling tower stage i ii sump tank overflow water drain line laying rerouting to bottom ash hopper unit i trench for zero discharge of a zone area and providing an accessories of water level indicator for sump tanks
Read moreSupply and installation of one (01) no. monoblock pumping machinery at high lift p/h of durgapur baylani water supply scheme zone-i with other allied works in the district of 24 pgs.(n) under eastern mechanical division sub division-i, phe dte. (sm c
Supply and installation of one (01) no. monoblock pumping machinery at high lift p/h of durgapur baylani water supply scheme zone-i with other allied works in the district of 24 pgs.(n) under eastern mechanical division sub division-i, phe dte. (sm c
Read moreNctps i se mi circle boiler maintenance division annual overhaul work for the year 25 26 specification no 56 25 26
Nctps i se mi circle aoh coh 25 26 bm dn unit ii repair rectification of eroded tubes in ltsh coil and other allied works during aoh coh for the year 2025 26
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Read moreNctps i se mi circle boiler maintenance division annual overhaul work for the year 25 26 specification no 41 25 26
Nctps i se mi circle aoh 25 26 bm dn unit i supply and installation of air sealants in penthouse of boiler during annual overhaul 2025 26 to avoid ash leakage air ingression to the boiler
Read moreNctps ii mi circle bm division unit ii 600 mw boiler supply and installation of
Nctps ii mi circle bm division unit ii 600 mw boiler supply and installation of
Read moreof your Industry type