Tender Details

About Tender

๐Ÿ“ž Amc Opportunity For Telephone Lines At Hocl ๐Ÿ“ž Hindustan Organic Chemicals Limited (Hocl), Under The Aegis Of The Central Government's Ministry/Department, Is Seeking Bids For The Annual Maintenance Contract (Amc) Of Telephone Lines For The Factory And Township For The Year 2024 25. ๐Ÿญ๐Ÿ”ง ๐Ÿ“… Bid Submission Deadline: May 17, 2024, 5:00 Pm The Location Of The Project Is Hocl, Ambalamugal. No Tender Fee Or Earnest Money Deposit (Emd) Is Required For Submission. Interested Vendors Should Provide Detailed Proposals, Including Technical Capabilities, Maintenance Strategies, And Financial Bids, To Ensure Uninterrupted Telecommunication Services At The Factory And Township Premises. Keywords: Amc, Telephone Lines, Hocl, Ambalamugal, Central Govt. Ministry/Department, Maintenance Contract, Government Tender
Particulars Details
Title
Amc Of Telephone Lines In Factory And Township 2024 25
Description
Amc Of Telephone Lines In Factory And Township 2024 25
Organisation Hindustan Organic Chemicals Limited | Central Govt. Ministry/Department
Tender Id 2024_MCF_754433_1
Reference
Number
HOC/ELE/WP/7042/24
Tender Fee 0
EMD 0
Tender Value
Place HOCL, AMBALAMUGAL
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=847047
Start Date May 03, 2024 14:30
End Date

17/05/2024 ( Expired 391 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar

Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Appointment of issuing bank for a letter of credit

Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp

Read more
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Read more
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.

Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise