Tender Details
Particulars | Details |
---|---|
Title |
Supply Installation Testing And Commissioning For Shifting Of Existing 11 Kv Line Along With Road Near Helipad At Gh Hospital On Upper Feeder By Way Of Replacing Existing Old 9 Mtr Poles On Full Turnkey Basis Under Sdp 2025 26
|
Description |
Same As Above
|
Organisation | Power Development and Non-Renewable Energy | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1000 |
EMD | 21000 |
Tender Value | |
Place | Leh |
Link |
AAAAAAAAAA Login to view |
Start Date | May 08, 2025 15:30 |
End Date |
14/05/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design manufacture supply erection testing and commissioning of 2x12.5 mva 33/11kv indoor substation- b including 33kv extended line at phase iii imt rohtak on turnkey basis.
Design manufacture supply erection testing and commissioning of 2x12.5 mva 33/11kv indoor substation- b including 33kv extended line at phase iii imt rohtak on turnkey basis.
Read moreSupply, erection, testing, commissioning of following works in nizamabad (erstwhile) district on turnkey basis. lot-i: 132/33kv ss pitlam (2x50mva ptrs) ii) 132kv dc/sc line (26.5km) from 220/132/33kv ss banswada to proposed 132/33kv ss pitlam iii) 132kv feeder bay at 220kv ss banswada lot-ii: (i) 220kv dc line (43km) from existing 220/132kv ss kamareddy to 220/11kv liss at yacharam thanda and connected 220kv bays
Supply, erection, testing and commissioning of following works in nizamabad (erstwhile) district on turnkey basis. lot-i: 132/33kv ss pitlam (2x50mva ptrs) ii) 132kv dc/sc line (26.5km) from 220/132/33kv ss banswada to proposed 132/33kv ss pitlam iii) 132kv feeder bay at 220kv ss banswada lot-ii: (i) 220kv dc line (43km) from existing 220/132kv ss kamareddy to 220/11kv liss at yacharam thanda ii) 1no. 220kv bay extension including bus extension at 220/132kv ss kamareddy (iii) 2nos. 220kv bay extensions at 220/11kv ss yacharam thanda (iv) 220kv bay extension at 220/132kv ss kamareddy
Read moreUp gradation of existing 40 mt capacity lorry weighbridge in to 60 mt by way of supply, installation, testing and commissioning of fully electronic computerized lorry weighbridge 60 mt capacity lorry weighbridge on turnkey basis at fsd jamshedpur.
Up gradation of existing 40 mt capacity lorry weighbridge in to 60 mt by way of supply, installation, testing and commissioning of fully electronic computerized lorry weighbridge 60 mt capacity lorry weighbridge on turnkey basis at fsd jamshedpur.
Read moreSitc for improvement and stabilization of ht lt lines and sub stations in leh district shifting re-alignment of existing 11kv line on 8mtr pole with 9mtr from cheeta chowk to soha rigpa junction on full turnkey basis under ut capex 2025 26
Same as above
Read moreSupply, erection, testing and commissioning of (a) 132kv ss valigonda and 132kv dc/sc line (17.5km) from ramannapet ss (b) 132kv dhandumalkapur ss and 132kv dc line (17.5km) from 400kv choutuppal ss in yadadri - bhongir district (c) 132kv dc/sc line (13km) from 220kv ss madgula to 132kv ss godakandla in nalgonda district on turnkey basis.
Supply, erection, testing and commissioning of (a) 132kv valigonda ss and 132kv dc/sc line (17.5km) from 132kv ramannapet ss (b) 132kv dhandumalkapur ss and 132kv dc line (17.5km) from 400kv choutuppal ss in yadadri-bhongir district (c) 132kv dc/sc line (13km) from existing 220kv ss madgula ss to 132kv ss godakandla in nalgonda district on turnkey basis.
Read moreSupply installation testing and commissioning for augmentation of sub-stations in leh district 100kva to 250kva at thiksay on full turnkey basis under ut capex 2025 26
Same as above
Read moreSupply installation testing and commissioning for ht extension works in various locations of leh district shey and saboo section on full turnkey basis under ut capex 2025 26
Same as above
Read moreSupply installation testing and commissioning for creation of 25kva sub-stations along with laying of ht lt line at phe pump gangles on full turnkey basis under deposit work 2025 26
Same as above
Read moreof your Industry type