Particulars | Details |
---|---|
Title |
Ignition Lance With Tip Suitable For Durag D Hg 400 72 Ex Length Of Lance Including Ignition Tip: 3
|
Description |
|
Organisation | Steel Authority of India Limited | Ministry of Steel |
Tender Id | GEM/2025/B/6031326 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | March 06, 2025 23:40 |
End Date |
17/03/2025 ( Expired 91 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
---|---|---|---|---|---|
1 | DURAG INDIA INSTRUMENTATION PRIVATE LIMITED | Make : OEM Model : IGNITION LANCE WITH TIP Title : IGNITION LANCE WITH TIP SUITABLE FOR DURAG D-HG 400-72 EX LENGTH OF LANCE INCLUDING IGNITION TIP: 3. | 20-03-2025 19:02:06 | MSE | Qualified |
S.No. | Seller Name | Offered Item | Total Price | Rank |
---|---|---|---|---|
1 | DURAG INDIA INSTRUMENTATION PRIVATE LIMITED(MSE)( MSE Social Category:General ) | Item Categories : IGNITION LANCE WITH TIP SUITABLE FOR DURAG D-HG 400-72 EX LENGTH OF LANCE INCLUDING IGNITION TIP: 3 | 3712500.00 | L1 |
Contract Details
- Contract Status:
- Order Accepted
- Seller:
- DURAG INDIA INSTRUMENTATION PRIVATE LIMITED
- Buyer Designation:
- Assistant General Manager MM
- Buying Mode:
- Bid/RA
- Contract Date:
- 2025-04-19 22:44:00 +0530
- Contract Amount:
- 4293135
Product | Brand | Model | Ordered Quantity | Price |
---|---|---|---|---|
IGNITION LANCE WITH TIP SUITABLE FOR DURAG D-HG 400-72 EX LENGTH OF LANCE INCLUDING IGNITION TIP: 3. | OEM | IGNITION LANCE WITH TIP | 6 | ₹ 1259319.600 |
, SOLENOID VALVE ASSEMBLY ALONG WITH TWO NOS OF LIMIT SWITCH | OEM | SOLENOID VALVE | 3 | ₹ 3033815.400 |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreSupply of 16 nos. telescopic (collapsible tower) vertical mast type portable led emergency lighting system with 0.75 kva genset (cpcb compliance) suitable for 6.4 hrs. continuous running
Supply of 16 nos. telescopic (collapsible tower) vertical mast type portable led emergency lighting system with 0.75 kva genset (cpcb compliance) suitable for 6.4 hrs. continuous running
Read moreFor surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 400 kv sarni-seoni line and 400 kv sarni-indirasagar line under tlm sub dn. sarni under ee eht (maint.) dn.itarsi
For surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 400 kv sarni-seoni line and 400 kv sarni-indirasagar line under tlm sub dn. sarni under ee eht (maint.) dn.itarsi
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreConstruction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipur north) with installation of opgw network on existing line including survey, supply under bn-9018002511
Construction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipuir north) with installation of opgw network on existing line including survey, supply under bn-9018002511(turnkey)
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreHiring the services of 1 number brand new ambulance with ac force trax cruiser ambulance 5 plus d plus p seater capacity 2wd diesel driven bs vi model or equivalent for a period of 4 years under medical section at ps8 sonapur oil india limited west bengal w e f 01 09 2025
Hiring the services of 1 number brand new ambulance with ac force trax cruiser ambulance 5 plus d plus p seater capacity 2wd diesel driven bs vi model or equivalent for a period of 4 years under medical section at ps8 sonapur oil india limited west bengal w e f 01 09 2025
Read moreof your Industry type